Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

2021 Downtown Overlay and Utility Project COB Project
Infrastructure
Bidding
$1,800,000 to $2,000,000 est. value
Bothell, WA

Warm Beach Water System Water Replacement
Infrastructure
Bidding
$2,000,000 est. value
Stanwood, WA 98292

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

Poplar Street - Colville to 5th
Infrastructure
Bidding
Walla Walla, WA 99362

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Redundant Feed to Squak Mountain Project
Infrastructure
Bidding
Issaquah, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Evergreen Apartment Water System Consolidation
Infrastructure
Bidding
$248,000 est. value
Onalaska, WA

Last Updated 01/28/2022 02:21 PM
Project Title

AC Water Main Replacement Project, 2021 Phase 3

Physical Address View project details and contacts
City, State (County) Bellevue, WA 98007   (King County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,034,752
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work contemplated to be performed under this contract is as follows: ±40 LF of 4 inch RJ ductile iron pipe; ±105 LF of 6 inch RJ ductile iron pipe; ±510 LF of 8 inch RJ ductile iron pipe; ±120 LF of 6 inch ductile iron pipe; ±8,425 LF of 8 inch ductile iron pipe; ±30 LF of 10 inch ductile iron pipe; two 4-inch gate valves; one 6-inch gate valve; seventy six 8-inch gate valves; 192 new water services; 2 blow off assemblies; 4 air vac assemblies; 18 new fire hydrant assemblies; associated paving and restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents