Similar Projects
Dock Expansion - Phase II
Addition, Infrastructure - 21,000 SF
Design
Pharr, TX

New Fender System at Wharf 1 at Turning Basin Terminal
Infrastructure
Bidding
Houston, TX

Oil Dock 1 Structural Repairs and Upgrades
Infrastructure
Bidding
Corpus Christi, TX

Derelict Vessel Removal Services
Post-Bid
Austin, TX 78701

Pier 10 Redevelopment / Pier 10 and 12 Dock Repairs
Infrastructure
Post-Bid
$5,500,000 est. value
Galveston, TX

Sources Sought for Access Dock Fire Pump and Pier Repairs - Maritime Administration Beaumont Reserve Fleet
Results
Beaumont, TX 77705

Beachside Redevelopment at Galveston Island State Park
New Construction
Results
$11,625,000 to $13,440,000 est. value
Austin, TX 78744

Southeastern Freight Lines
Renovation
Construction
El Paso, TX 79907

New OC-2 Ship Dock Marine Construction
Alteration
Bidding
Beaumont, TX

Pier 39-40 Mooring Modifications
Infrastructure
Post-Bid
Galveston, TX

Bartlett Soccer Complex Fishing Pier Improvements Project
Results
Laredo, TX 78041

Rehabilitation and Repair of Wharf No. 8 at the Turning Basin Terminal
Infrastructure
Bidding
Houston, TX

Berth 6 Expansion Project
Infrastructure
Post-Bid
Port Arthur, TX

Keith Lake Boat Ramp Modification
Results
Beaumont, TX 77701

Sylvan Pier Repair
Infrastructure
Post-Bid
La Porte, TX

Last Updated 03/23/2022 04:21 PM
Project Title

OC1 and OC3 Dock Construction (Jefferson)

Physical Address View project details and contacts
City, State (County) Beaumont, TX   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Civil Site Work including clearing, grading, excavation and backfilling. 2. Timber pile procurement and installation. 3. Underground pipe installation. 4. Concrete manifold construction. 5. Structural steel fabrication and installation. 6. Piping fabrication and installation. 7. Winch and loading hoses procurement and installation. 8. Valve and MLA installation (fabrication and delivery by others).

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents