Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Full-Service Mechanical Maintenance
Bidding
Denver, CO

TOSV Snowmelt Boiler Project
Bidding
Snowmass Village, CO 81615

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Walk In Cooler
Post-Bid
Golden, CO 80401

SB 267 Repair/Upgrade to Mechanical and Electrical Systems
Results
Less than $155,000 est. value
Fruita, CO 81521

H--Boiler Lifespan Assessment
Results
Grand Junction, CO 81501

Secondary Building Water Heater Replacement
Bidding
Dove Creek, CO

Sb267 Replace Water Softners Bldg 118
Post-Bid
Pueblo, CO 81003

Fleet Management Exhaust Recovery System Install
Results
Less than $100,000 est. value
Loveland, CO 80537

Full and Partial Industrial Boiler Retube/Repair
Bidding
Littleton, CO 80123

Rangeview Boiler Replacement
Post-Bid
Aurora, CO 80013

Seven Lakes Restroom Renovation
Results
$300,000 to $400,000 est. value
Loveland, CO 80538

2021 Bill Heddles Recreation Center Boiler Upgrade Project
Bidding
Delta, CO 81416

Reported 05/14/2020 12:00 AM
Project Title

Purchase and Installation of Pumps for Hydronic Boiler(s)

Physical Address View project details and contacts
City, State (County) Longmont, CO 80501   (Boulder County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1) Demo existing pumps (2) and remove from site 2) Demo existing supply and return headers at flanges and Victaulic fitting 3) Demo Expansion tank and pot feeder 4) Set skid on existing pad (District to Level) 5) Set district supplied expansion and pot feeder 6) Mount district supplied air/dirt separator 7) Rework return and supply 3 inch line to all equipment 8) Bring electric sub to walk for new pumps 9) Factory start-up on pumps 10) Control will be completed by SVVSD

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents