Similar Projects
Vault Toilet Pumping Service
Term Contract
Post-Bid
Boise, ID 83702

Spring Valley Wastewater Treatment Plant Phase 1
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Eagle, ID 83616

FY22 Capital Maintenance, Phase 1, Boise
Infrastructure
Post-Bid
$15,000,000 CJ est. value
Boise, ID 83702

Sewer Line and Drain System Improvements
Infrastructure
Post-Bid
$130,000 CJ est. value
Boise, ID 83702

High Density Polyethylene Pipe (HDPE) Lining
Term Contract
Sub-Bidding
Boise, ID 83702

ARPA Boise Riverbank Stabilization Project 2023
Infrastructure
Results
$272,500 CJ est. value
Boise, ID 83702

exp - Holt Arena President's Deck Mechanical and Plumbing
Alteration
Post-Bid
$200,000 est. value
Pocatello, ID

2022, East Ustick Road Trunk Line, Dixie Drain to Florida Avenue
Infrastructure
Results
$1,244,889 CJ est. value
Caldwell, ID 83605

NWB Shoshone Outbuildings - 50% CD
Alteration
Post-Bid
Preston, ID

Replace Sink
Alteration
Post-Bid
ID

Last Updated 01/12/2023 07:07 AM
Project Title

Wastewater Treatment Plant Dewatering Project

Physical Address View project details and contacts
City, State (County) Idaho Falls, ID 83402   (Bonneville County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $9,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project contemplated consists of improvements and modifications to the existing City of Idaho Falls Wastewater Treatment Facility. Work associated with this project includes construction of a new dewatering building (including two new screw presses, polymer room and electrical room); a new submersible pump centrate lift station; new digester pump mixing systems including two new pump rooms; a new ferric chloride storage and distribution facility with an adjacent bathroom; addition of a fourth pump to the existing utility water facility; expansion and modification of the plant electrical power supply, instrumentation and control systems; and other appurtenances, miscellaneous demolition, earthwork, yard piping, and site work to accommodate the facility upgrades. Only prequalified general/prime contractors are allowed to bid. Prequalified general contractors include: COP Construction, LLC (801.683.3101) GSE Construction Company, Inc (925.447.0292) IMCO General Construction, Inc (360.410.0128) JC Constructors, Inc (208.850.1375) Record Steel and Construction, Inc (208.472.0195) All questions about the meaning or intent of the Contract Documents shall be submitted to Engineer (TOFOR.SNIDER@CONSORENG.COM & CRAIG.ANDERSON@CONSORENG.COM) in writing.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents