Similar Projects
Filing 34 Central Park Station Plaza
Infrastructure
Post-Bid
Denver, CO

Ft Morgan Poe Scale Pit Drain
Infrastructure
Post-Bid
$30,000 est. value
Denver, CO

2021 Preventive and Critical Lining
Results
$3,500,000 to $3,900,000 est. value
Denver, CO 80202

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Public Improvements within Phase 2 of The Point Redevelopment Project
Construction

Construction of Filing 40th Avenue Extension
Infrastructure
Post-Bid
Denver, CO 80238

East 16th Avenue System, Phase 1
Results
$8,500,000 to $9,400,000 est. value
Denver, CO 80202

2021 Capital Improvements Project Point Repair and Cured-in-Place Pipe
Infrastructure
Post-Bid
Lakewood, CO

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

2022 Sewer Improvements
Infrastructure
Post-Bid
Denver, CO

General Sanitary - Lincoln Park North
Results
$900,000 to $1,100,000 est. value
Denver, CO 80204

Ledge Rock Center Public Improvements
Infrastructure
Post-Bid
CO

Grays Peak General Storm
Results
$4,400,000 to $4,800,000 est. value
Denver, CO

R2 Culvert Corrugated Metal Piping
Infrastructure
Post-Bid
CO

NW and SW Aquatic Habitat Design-Build Projects
Results
Less than $350,000 est. value
Denver, CO

Reported 06/01/2022 12:00 AM
Project Title

Up Clear Creek Project

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Work Will Include Safeguarding Thirty Nine (39) Features Employing a Variety of Closure Methods. A Summary of the Included Features Is Listed Below; Machine Backfill 10 Grates 15 Bulkhead 7 Corrugated Steel Pipe (Csp) 4 Split Rail Fence 3 the Mine Closure Locations Are Found on Both Public and Private Lands. Access to Several Locations Is Difficult and Involves Either Climbing Up and Down Steep Slopes or Traversing Long Off-road/trail Distances or Both

Details

Division 01 - General Requirements.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 10 - Specialties.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents