Similar Projects
Pine Ridge Elementary School New Administration Building
New Construction
Conception
$3,300,000 est. value
Magalia, CA 95954

Cedarwood Elementary School Classroom Wing Addition
Addition
Conception
$13,900,000 est. value
Clovis, CA 93611

Delevan Drive Elementary School
Addition
Design
Los Angeles, CA 90065

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Telfair Elementary School ADA Barrier Removal
Infrastructure
Bidding
$1,910,000 CJ est. value
Los Angeles, CA 91331

Ericson Elementary School New Multi-Purpose Building and Interim Housing
Demolition, New Construction, Infrastructure
Bidding
$9,409,153 CJ est. value
Fresno, CA 93703

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Sub-Bidding
$75,000,000 CJ est. value
Hayward, CA 94544

Arvin Education Center - Roofing ONLY
New Construction
Sub-Bidding
$500,000 CJ est. value
Arvin, CA 93203

Park ES Early Education Center Renovations
Renovation - 3,086 SF
Post-Bid
$220,000 est. value
Alhambra, CA 91899

Ramona Playground & Room Alterations at Sanchez
Renovation
Post-Bid
Norwalk, CA 90650

Architectural Services for HVAC Systems And Development Of New Permanent Modular Building(s)
Renovation, Alteration
Results
Buttonwillow, CA 93206

Orchard Dale Elementary School Modernization Project- General Construction
New Construction - 68,394 SF
Results
Whittier, CA 90603

Phase 1 Esser Shade Structures - Group 2 Various Sites
Infrastructure
Construction
$695,000 CJ est. value
Lakewood, CA 90712

Construction of the Exterior Corridor Structural Repairs
Renovation
Construction
$620,977 CJ est. value
Hanford, CA 93230

Vermont Manchester
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Los Angeles, CA 90044

Last Updated 01/25/2023 04:14 PM
Project Title

Harmon Johnson Elementary School Roof Replacement Project

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95815   (Sacramento County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected June 2019 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,170,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As per the notice dated February 12,2019, The Bid date has been postponed. The successful bidder shall commence work with the issuance of the Notice to Proceed and fully and finally substantially complete all work by August 12, 2019. Contract completion (Closeout) will be by November 11, 2019. The District has established a liquidated damage rate of $750.00 per calendar day for each and every calendar day that the work remains fully uncompleted or unaccepted by the District. Each Bid must be accompanied by one of the following forms of bidder's security: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure section 995.120, made payable to the District in the form set forth in the Bid Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid for each site, as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required performance and payment Bonds, insurance certificates and any other required documents. In the event of failure to enter into said Contract or provide the necessary documents, said security will be forfeited. Within 10 days after notification of the Award of Contract, the successful bidder or bidders will be required to furnish, simultaneously with execution of the Contract, a Labor and Material Payment Bond and a Faithful Performance Bond in the form required by the District, each in an amount equal to one hundred percent (100%) of the Contract Price from an admitted surety companyas defined in Code of Civil Procedure section 995.120. Bidders must have a determination of prequalified status at least five (5) days before bid opening. Questions regarding bidding procedures may be directed to the contacts listed above. Questions regarding bid specifications and site work should be directed to the following by January 24, 2019 @ 3:00 pm: PBK Architects: Jessica.Edwardson@pbk.com; Kim.Johnson@pbk.com; Zoe.Bick@pbk.com cc: Greystone West Company: denise@greystonewest.com; czunino@greystonewest.com; john@greystonewest.com cc: TRUSD Perry.Herrera@twinriversusd.org

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents