Similar Projects
Leith Creek Flood Damage Reduction Project
Term Contract
Design
$500,000 to $1,000,000 est. value
Laurinburg, NC

Moravian Creek Emergency Repairs
Alteration
Design
$500,000 to $1,000,000 est. value
Wilkesboro, NC

Drysdale Drive Extension
Bidding
NC

Sandy Creek Drive Culvert Replacement
Infrastructure
Bidding
$291,595 est. value
Wilson, NC 27893

Pathways Elementary School Exterior Drainage
Post-Bid
Hillsborough, NC 27278

CEIC Sinkhole Repair
Post-Bid
Asheboro, NC 27205

USDA FS NFsNC Tusquitee RD Shuler Creek Stream Restoration Project
Results
$25,000 to $100,000 est. value
Murphy, NC 28906

Historic Courthouse Drainage and Waterproofing
Results
Statesville, NC 28677

College Acres Drive and Clear Run Branch Drainage Improvements and Stream Restoration Phase I
Infrastructure, Alteration
Bidding
Wilmington, NC 28403

Willow Pond Stream Restoration
Post-Bid
Cornelius, NC 28031

N-12 HDPE IB/WT Double Wall N-12-FY21
Results
Less than $1,809 est. value
Jacksonville, NC

Springside Drive Stream Restoration and Drainage Improvements ARPA Project
Infrastructure
Bidding
Clemmons, NC 27012

Corrugated Aluminum Pipe
Post-Bid
Fayetteville, NC 28306

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

Corporation Drive Outfall
Infrastructure
Bidding
NC

Last Updated 02/14/2022 09:31 AM
Project Title

Stream Debris Removal: Stretches within the Lower Little River, Anderson Creek,and Upper Little River

Physical Address View project details and contacts
City, State (County) Lillington, NC   (Harnett County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,638,347
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will consist of the removal of stream debris, including beaver dams, which impede stream flow or navigation as determined by the Project Inspector. Only trees and debris that has entered the stream as a result of Hurricane Florence shall be removed. No Tree Stumps should be removed from the stream bank and no sediment should be removed from the stream. Loose stream debris should only be placed on existing spoil piles on the adjacent stream bank and should be placed so debris will not reenter the stream or cause any additional erosion problems.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents