Similar Projects
Sage Creek Phase 1 Residential
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Horn Lake, MS 38637

Rehabilitation of Water Well 4
Infrastructure
Bidding
$1,500,000 CJ est. value
Kosciusko, MS 39090

Rehabilitation of Water Well 4
Infrastructure
Bidding
$1,500,000 CJ est. value
Kosciusko, MS 39090

Hermanville Multi-Use Trail
Infrastructure
Post-Bid
$200,000 CJ est. value
Port Gibson, MS 39150

Choctaw County Schools Football Stadium
New Construction, Infrastructure
Post-Bid
$70,000 CJ est. value
Ackerman, MS 39735

Water Improvements
Infrastructure
Results
Pittsboro, MS

Woodland Clinic Addition
Addition, Demolition, Renovation, Infrastructure
Results
$418,500 CJ est. value
Woodland, MS 39776

McAlister's Deli / Greenwood
Demolition, New Construction, Infrastructure - 3,000 SF
Construction
$1,300,000 CJ est. value
Greenwood, MS 38930

Hernando High School
New Construction, Infrastructure
Construction
$85,211,000 CJ est. value
Hernando, MS 38632

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

Stateline Business Park Building G
New Construction, Infrastructure - 352,800 SF
Pending Verification
$38,000,000 CJ est. value
Southaven, MS 38671

Alcorn County Health Department Addition and Renovations (Rebid)
Addition, Demolition, New Construction, Infrastructure - 1,000 SF
Bidding
$647,000 CJ est. value
Corinth, MS 38834

Advanced Metering Infrastructure and Energy Management Information System (AMI-EMIS)
Infrastructure, Alteration
Post-Bid
$160,000 est. value
Hattiesburg, MS 39406

Baxter Healthcare Water Well Improvements Project
Renovation
Results
$1,251,996 CJ est. value
Cleveland, MS 38732

Lewisburg High School Band Addition
Addition, Demolition, Infrastructure - 5,645 SF
Construction
$2,000,000 CJ est. value
Olive Branch, MS 38654

Last Updated 10/03/2023 08:33 AM
Project Title

New Water Well and Associated Improvements

Physical Address View project details and contacts
City, State (County) Ashland, MS 38603   (Benton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of: Furnish and Installation of a new 250 GPM Water Well and associated piping. A satisfactory Bid Bond executed by the Bidder or an accepted Surety, a certified check, or bank draft payable to the TOWN OF SNOW LAKE SHORES, MISSISSIPPI, on negotiable U.S. Government Bonds (at par value), shall be submitted with each bid in an amount equal to five percent (5%) of the total bid. Bidders are directed to the contract requirement that not less than the minimum wages and salaries set forth in the Contract Documents must be paid on this project, in accordance with the Davis-Bacon and Related Acts. In addition, the Contractor must ensure that employment and applicants for employment are not discriminated against because of their race, color, religion, sex or natural origin. The Town of Snow Lake Shores is an Equal Opportunity Employer, and hereby notifies all Bidders will be afforded the full opportunities to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other legally protected status in consideration for an award. Minority and Woman Owned Business Enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities, equipment, material and/or supply needs. This project is being funded in part by a Community Development Block Grant (CDBG) and is subject to the rules and regulations thereof and is subject to the requirements of Section 3 of the Housing and Urban Development (HUD) Act of 1968, as amended. This project is being funded in part by the AMERICAN RESCUE PLAN ACT MUNICIPALITY & COUNTY WATER INFRASTRUCTURE (ARPA/MCWI) GRANT PROGRAM and is subject to the rules and regulations thereof. Bids may be held up to 90 days from the date of opening for review of bids and qualifications of bidders prior to Contract award. The TOWN OF SNOW LAKE SHORES, MISSISSIPPI reserves the right to reject any or all bids or to waive any informality in the bidding.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents