Similar Projects
Replace Waterline
Infrastructure
Design
$900,000 est. value
Centralia, IL 62801

Water Main at Mile Long Bridge
Infrastructure
Bidding
IL

Water Meter Replacement
Infrastructure
Bidding
$251,000 est. value
Potomac, IL

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

2020 Sanitary & Water Structure Rehabilitation
Renovation
Results
Lincolnshire, IL 60069

Vetter Road Segment II Roadway Reconstruction & Realignement Drainage Improvements
Addition
Construction
Joliet, IL

Water Main Construction at Mile Long Bridge
Infrastructure
Bidding
Downers Grove, IL

Condition Assessment of Water Distribution System Valves
Term Contract
Post-Bid
Washington, IL

Main Street Water Extensions
Results
$200,000 est. value
Pecatonica, IL 61063

Replace Campus Waterline
Infrastructure
Bidding
Less than $1,500,000 est. value
Carbondale, IL 62901

Glenside Water Main - Site Utilities
Post-Bid
Glendale Heights, IL 60139

Route 31 Water Main Relocation - Phase 2
Results
$1,000,000 to $2,000,000 est. value
South Elgin, IL 60177

Lincoln-Ashland-Belmont Section 2 Improvements
Infrastructure
Bidding
Chicago, IL

Reported 10/23/2021 12:00 AM
Project Title

Replace #4 Combined Overflow Pump Discharge Pipe

Physical Address View project details and contacts
City, State (County) Granite City, IL   (Madison County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

• Replace #4 Combined Overflow Pump (COP) discharge pipe. • The pipe is 42” in diameter and 8’ long. • The pipe must be equal to or better than the existing material used. • This will require removal of the motor, pump, and piping. • This will also require to put everything back to normal position once replaced. • This will also require testing of the equipment when completed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents