Similar Projects
Lake Wentworth Grant Project - Phase 4 - 2021
Infrastructure
Post-Bid
Wolfeboro, NH 03894

Portsmouth Christian Academy Drainage & Site Improvements
Renovation
Post-Bid
Dover, NH 03820

Camp Birchmont Stormwater Improvements
Infrastructure
Results
Wolfeboro, NH 03894

S208--Storm Water Maintenance Services
Results
Manchester, NH 03104

Stormwater Site Improvements - City of Nashua
Infrastructure
Conception
$400,000 est. value
Nashua, NH 03060

Woody Hollow Water, Sewer, & Drainage Improvement Project
Renovation
Post-Bid
Boscawen, NH 03303

Water, Sewer & Drainage Improvements
Construction
Jaffrey, NH 03452

Roxbury Street Flood Improvements
Results
Less than $1,860,000 est. value
Keene, NH 03431

Cemetery Road Utility and Roadway Reconstruction
Results
Less than $3,500,000 est. value
Somersworth, NH

Wastewater Infiltration And Inflow - City Of Nashua
Renovation, Infrastructure
Conception
$400,000 est. value
Nashua, NH 03060

Last Updated 07/12/2022 01:21 AM
Project Title

Storm Drain Culvert Rehabilitation

Physical Address View project details and contacts
City, State (County) Henniker, NH 03242   (Merrimack County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Locations with approximate Footage: 1. Main Street, approx. 220 feet of twelve-inch corrugated steel, and approx. 455 feet of eighteen-inch corrugated metal pipe to be lined. Scope of work: 1.Three Main Street basins are to be replaced in kind per NHDOT Standards, basins 2, 3, and 5 as shown on attach overview. 2. Replace or repair top slab lid and reset frame and grate on Basin 4. Construction contractor will be required to reset any granite curbing and sidewalks repair should any be disturbed, and asphalt replacement. 3.Cleaning of the existing corrugated metal pipes to remove any obstructions that would prevent installation of the HDPE liner pipe. 4.Installation of the HDPE liner pipe through the existing pipe at excavated insertion pits. 5.Construction of all Low-Density Cellular Grout (LDCG) retaining bulk heads on the inlet/outlet ends of the lined drainage runs. 6.Furnish and pumping of LDCG material into annular space between the existing pipe and pipe liner. 7.Contractor shall place LDCG using a concrete pump and air foam generator to deliver desired pressure and wet-cast density. 8.Contractor shall ensure all voids are filled by pumping grout from upstream or downstream of culvert and continue pumping until grout is expelled from the highest vent pipe on the Inlet end. 9.Contractor shall be solely responsible for any damage or distortion of the pipe liner due to the grouting process. 10.Contractor shall comply with the pipe manufacturer's recommendations for grouting procedures. 11.Spills shall be minimized and cleaned up immediately. 12.Pipe used must be 4710 HDPE SDR32.5 liner pipe, the liner pipe will be butt fused on site per manufacturers recommendations. LDCG shall have a wet cast density of 35-50 PCF and have a minimum 300 PSI after 28-day cure, flowable fill is not an acceptable alternate to LDCG. 13.Steel plates to cover insertion pits will be allowed at the end of each workday provided they are load rated and placed following industry standards and must meet all safety guidelines. 14.Debris collection system must be always in place to prevent any entering the river. 15.All excess material must be removed from site and disposed. 16Certified traffic control personnel and signage to be provided by the contractor, with the understanding that emergency vehicles and school buses will not be delayed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents