Similar Projects
Last Updated | 06/06/2019 12:15 PM |
Project Title | Echo Lake Sewer Outfall Rehabilitation Project |
Physical Address | View project details and contacts |
City, State (County) | Douglasville, GA (Douglas County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be performed shall include approximately 6,262 linear feet of sewer lines which require rehabilitation, divided in two phases. Phase A consists of approximately 3,400 linear feet of 30-inch ductile iron pipe (DIP) and Phase B consists of approximately 2,862 linear feet of 30-inch DIP. Cured-In-Place-Pipe (CIPP) trenchless technology will be the method used to rehabilitate both Phases A and B. However, other methods may be considered, if proposed. The Authority reserves the right to award this Project as one complete project to one Contractor or to award each Phase as a separate project to separate Contractors. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |