Similar Projects
Sewer Force Main Replacement
Infrastructure
Bidding
$372,000 est. value
Margate, FL

Lyons Park Stormwater and Wastewater Improvements
Post-Bid
Pompano Beach, FL

Sanitary Sewer Lateral Connection and Lateral Pipe Product
Post-Bid
Plantation, FL

Commercial Boulevard Force Main Replacement Project
Results
Less than $350,000 est. value
Tamarac, FL 33321

Infiltration Removal Lateral and Mainline Lining Program
Term Contract
Results
Less than $3,169,282 est. value
Pembroke Pines, FL 33025

Utility Analysis Zone 108
New Construction, Infrastructure
Post-Bid
$21,504,000 est. value
Pompano Beach, FL 33060

Replacement of Hallandale Beach Force Main and Large User Meter Lum-07
Results
$2,171,973 est. value
Hollywood, FL 33022

Pines Village Water Main Improvements Phase II and Septic Tank Conversion
Infrastructure
Post-Bid
$13,778,000 est. value
Pembroke Pines, FL

Rehabilitation of Sewer Manholes
Results
Miramar, FL 33023

Civil Work Related to Taft Street Force Main Wall Loss Verification
Infrastructure
Post-Bid
$400,000 est. value
Hollywood, FL 33019

Sanitary Sewer Collection System for District 2 Septic Tank Elimination Area 2-F
Infrastructure
Results
$2,570,829 est. value
FL

Emergency Installation & Repair Services For Water & Wastewater
Infrastructure
Post-Bid
$6,489,480 est. value
FL

City-Wide Rehabilitation of Sewer Lateral Pipe Lining
Infrastructure
Results
Plantation, FL

Water and Sewer Emergency Repairs Services
Infrastructure
Post-Bid
Miramar, FL

Citywide Utility Repair Services - Term Contract
Term Contract, Infrastructure
Results
Plantation, FL

Last Updated 05/17/2022 10:45 AM
Project Title

NE 22 Avenue Force Main Phase 2

Physical Address View project details and contacts
City, State (County) Lighthouse Point, FL 33064   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $786,930
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

County Business Enterprise Goals: 30% CBE Goals. Scope includes, but is not limited to, the furnishing of all labor, materials, equipment, services and incidentals for the construction of infrastructure site work. The work will include but not be limited to site preparation, earthwork, force main installation, existing force main abandonment, roadway and walkway restoration, landscape restoration, pavement marking restoration and site furnishings.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents