Similar Projects
Postvale Road, Grier Road Rehabilitation Phase 2 - ST095 - Town of Marana
Infrastructure
Conception
$260,000 est. value
Marana, AZ

Tangerine Road Widening, Phase 2A - ST098 - Town of Marana
Alteration
Conception
$27,000,000 est. value
Marana, AZ 85658

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Bidding
$27,461,166 est. value
Tucson, AZ 85706

Why-Tucson Highway (SR 86) (Tribal Route 232 - Sells Mp 10)
Infrastructure
Bidding
$2,300,000 est. value
Sells, AZ 85634

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Groundhog Vista Landowners Roadwork
Post-Bid
Tucson, AZ 85743

Pavement Reconstruction Package 2021
Results
Less than $2,181,254 est. value
Marana, AZ 85653

High Water Crossing at Vamori Wash
Results
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

Costco #407 Entry Drive Widening
Renovation
Construction
Tucson, AZ 85712

First Avenue - SR11- River To Grant - City Of Tucson
Infrastructure
Conception
$74,398,000 est. value
Tucson, AZ 85755

Casa Grande - Tucson Highway (I-10) (I-10; Wymola to Ina Rd)
Infrastructure
Bidding
$6,305,000 est. value
Tucson, AZ 85706

Gladden Farms Birchfield Drive and Mikeetter Boulevard (East)
Infrastructure
Post-Bid
Marana, AZ

Magrino Industrial Park Unit No 3 Base Phase Roadway Improvements
Results
$500,000 est. value
San Luis, AZ

Asphalt Repair and Re-Pavement Materials and Services
Term Contract
Post-Bid
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, Somerton, Tucson, Winslow, AZ 85607

Saguaro Bloom Community Park; Paving, Drainage and Utility Improvements
Results
Marana, AZ

Reported 07/15/2022 02:39 PM
Project Title

Grant Road - Oracle To Swan - SR2A - City Of Tucson

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85755   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $168,153,700 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Tucson, Arizona. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Design and construct improvements along Grant Road from Oracle Road to Swan Road. The phased improvements will include widening Grant Road to a six-lane, divided cross section with full urban amenities and the alignment approved by the Mayor and Council. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of July 14, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents