Similar Projects
Last Updated | 12/21/2018 03:35 PM |
Project Title | Oxygen Production Upgrades SDWWTP |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL (Miami-Dade County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $8,267,365 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work includes, but is not limited to, upgrading the existing oxygen production facilities which shall include construction of a new electrical building, installation of an owner furnished centrifugal compressor, and overhaul of the existing centrifugal compressor. The purpose of the upgrade will be to increase the oxygen production capacity at the plant and to provide for redundancy of equipment. The work consists of, but is not limited to, the following: - Upgrade of compressor No. 3 from 100-tons to 125-tons, furnished by the Department. - Installation of new 125 ton Compressor No. 4, furnished by the Department. - Installation of Local Control Panel for Compressor Nos. 3 & 4, furnished by the Department. - Installation of all new compressor ancillary components including but not limited to the inlet filter for each compressor. - Piping modifications and additions to connect Compressor No. 4 to the existing Cryogenic Oxygen Plants. - Construction of a new Electrical Building to power Compressor Nos. 3 and 4, complete, including, two (2) 5000 kVA Transformers, two (2) 5 kV Switchgears, two (2) 15 kV Switchgears and 25 Ton air conditioning system. - Installation of a new Motor Control Center. - Electrical wiring modifications to feed power to the new and upgraded compressors to include installation of two (2) new 15 kV feeders from the existing Switchgear Building 1 to the new Electrical Building with two (2) feeder jumpers at the new 15 kV switchgear, new electrical duct bank to accommodate the new 15 kV feeders and new 15 kV feeder from existing Switchgear Building No. 1 to existing Substation No. 17. - Decommissioning in place of the following components and equipment: Compressor Nos. 1 & 2; Starters for Compressor No. 1 and No. 2 and Substation Nos. 3, 4 and 20 - Demolition of the following components: Air and Cooling Water Piping for Compressor Nos. 1 & 2; Compressor No. 3 inlet air piping, valves and filter components; Compressor No. 3 discharge silencer and blow-off valve; 15 kV feeders to Compressor No. 1 and Compressor No. 2; and 15 kV feeder jumper between Substation 1 and Substation 17. - Site Civil and Stormwater work. - Relocation of existing utilities. | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |