Similar Projects
Smart Overlay and ADA Ramp Improvements
Infrastructure
Bidding
$600,000 est. value
New Lenox, IL 60451

Old Plank Road Trail Asphalt Repair and Replacement
Infrastructure
Bidding
$270,000 est. value
Joliet, IL 60436

Heritage Bluffs Golf Club Cart Path
Post-Bid
Channahon, IL 60410

BHS South Lot Rehabilitation
Post-Bid
Romeoville, IL

Lake Strini Improvements.
Results
Romeoville, IL

ADA Improvements Project Consist of Retrofitting Curb Ramps for Sidewalks to Make Compliant with PROWAG
Results
IL

Water Street Parking Lot
Infrastructure
Bidding
$230,000 est. value
Wilmington, IL 60481

Commissioners Park and Dupage River Sports Complex Parking Lot Renovations
Post-Bid
Naperville, IL 60565

2021 Parking Lot Improvements
Results
Joliet, IL 60431

2022 Sidewalk/ Curb Replacement Project - East Area
Infrastructure
Bidding
$200,000 est. value
Joliet, IL

Hot-Mix Asphalt Parking Lot Reconstruction and Resurfacing
Infrastructure
Post-Bid
Channahon, IL 60410

(1.06-Mile) SMART Overlay, ADA Improvements: HMA removal and Replacement (Single Pass), Pavement Patching, Pavement Markings
Results
Bolingbrook, Romeoville, IL 60440

Remove and Replace 6,220 Sf of Sidewalk
Infrastructure
Post-Bid
Channahon, IL

Resurfacing, Curb and Gutter, Sidewalk Replacement, Ornamental Lighting, Brick Paver Sidewalk, Landscaping and Pavement Markings
Results
Lockport, IL 60441

Driveway Replacement
Infrastructure
Post-Bid
New Lenox, IL 60451

Reported 06/17/2022 12:00 AM
Project Title

2022 Sidewalk Program

Physical Address View project details and contacts
City, State (County) Lockport, IL   (Will County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

2022 Sidewalk Program: Installation of 407 sq ft of new sidewalk, removal and replacement of 7823 sq ft of sidewalk, 26 SY of driveway pavement removal, 26 SY of concrete driveway installation, remove and replace 50 ft of concrete curb and gutter. In addition, dirt restoration and seeding, 50 sq ft of ADA detectable warning plates.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents