Similar Projects
New Emergency Generator at Ashley Plaza
Bidding
Hialeah, FL 33010

Emergency Generator Installation
Alteration
Bidding
Hialeah, FL

CD 1.11 - Emergency Generators 1 thru 4 Rehab SDWWTP
Post-Bid
Less than $2,154,000 est. value
Miami, FL 33190

Installation of Solar Photovoltaic Systems
Post-Bid
Miami, FL

LED Smart Lighting and Smart County Systems
Results
Less than $176,516,780 est. value
Miami, FL 331281983

Trip Saver II Recloser Pole Top
Results
Homestead, FL 33030

Electrical Services - As Needed
Term Contract
Bidding
Miami Lakes, FL

Jackson Dade Head Start Electrical Meter Upgrade
Post-Bid
Less than $11,500 est. value
Miami, FL 33136

Design/Build of Downtown LED Lighting Upgrade
Results
$250,000 to $750,000 est. value
Surfside, FL 33154

Emergency and Standby Generator Equipment, Maintenance, Service and/or Repair
Term Contract
Bidding
FL

Eureka Adult Day Training Center
Renovation
Post-Bid
Miami, FL 33157

Community Center Lighting Led Retrofit Project
Results
Key Biscayne, FL 33149

EV Charging Stations
Post-Bid
Miami Lakes, FL 33014

Maintenance and Repairs of Emergency Generators
Results
Miami, FL 33133

6140--Battery Bank Replacement
Post-Bid
Miami, FL 33125

Reported 06/08/2021 12:00 AM
Project Title

Generator and Installation

Physical Address View project details and contacts
City, State (County) Coral Gables, FL   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Miami CBP Argicultural Canine Facility was built in 1975. This facility is owned and operated by CBP. CBP Facilities staff has identified that an on-site emergency generator system is required at this location to meet current CBP facility standards. CBP is requesting qualified vendors provide an estimate for installing a new on-site generator with the following components: • Install new on-site generator with built in fuel tank (final sizing to be determined by vendor) that provides enough power to support all existing building loads. Initial assumption is that a 50 KW Automatic Standby Diesel Generator with fuel tank will be required. • Install new 200 amp automatic transfer switch with service disconnect. • Fuel storage tank capacity should be sized to ensure that on-site generator can operate at least 65 hours of uninterrupted during power outage. • Install new 6 inch concrete pad at rear of building to support new generator installation. • Make all necessary tie-ins to existing power panel. • Contractor will be required to obtain all necessary permits to meet local requirements. • All interested vendors should plan on visiting site to confirm existing conditions.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents