Similar Projects
Pier G 212-213 Shiploader No. 2 Replacement Project at Pier G Metro
Renovation
Bidding
$12,100,000 CJ est. value
Long Beach, CA 90802

Marsh Creek Bridge Replacement
Demolition, Infrastructure
Bidding
$12,182,000 CJ est. value
Clayton, CA 94517

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Plumbing Services
Term Contract
Sub-Bidding
Alhambra, CA 91801

Plumbing Contractor Services
Term Contract
Post-Bid
Concord, CA

Design and Construction of a Monitor Steel Frame Barn Building at the George A. Ingalls Event Center
New Construction, Term Contract, Alteration
Post-Bid
Norco, CA

Plumbing Contractor
Term Contract
Results
Concord, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Michelson Water Recycling Plant Tertiary Filter Improvements
Renovation, Infrastructure
Bidding
$17,899,000 CJ est. value
Irvine, CA 92612

F-End Piping Modification
Infrastructure
Sub-Bidding
Los Angeles, CA 90012

Airport Plumbing Repairs and Inspections as Requested
Alteration
Post-Bid
Livermore, CA 94551

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

Main Street Sewer Pipe Replacement Project
Infrastructure
Bidding
$800,000 CJ est. value
Alhambra, CA 91801

Backflow Maintenance and Repair Services
Term Contract
Sub-Bidding
Coalinga, CA 93210

On-Site Non-Potable Water Reuse Strategy
Alteration
Post-Bid
$250,000 est. value
Sacramento, CA

Last Updated 03/20/2023 12:09 AM
Project Title

2022 Landfill Gas Collection System and Perimeter Leachate System Modifications for Bedwell Bayfront Park

Physical Address View project details and contacts
City, State (County) Menlo Park, CA 94025   (San Mateo County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,882,900 [brand] Estimate
Plans Available from Project Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work in the Bedwell Bayfront Park Landfill includes replacing, modifying, and upgrading portions of the existing landfill gas collection system (LGCS) and perimeter leachate system (PLS) to improve performance, integrate with park uses, and extend their operating lives. The scope of Landfill Gas Collection System (LGCS) work includes decommissioning 26 existing non-functioning landfill gas (LFG) extraction wells and pipe sections, drilling and installing approximately 500 feet of new LFG extraction wells, installing 46 replacement and 16 new wellheads of various types, and approximately 11,200 linear feet of 6-inch, 2-inch and 1-inch diameter high density polyethylene (HDPE) pipe below ground, with utility boxes, pneumatic condensate and leachate pumps, and ancillary connections. The scope of Perimeter Leachate System (PLS) work includes repairing/refurbishing 12 existing perimeter leachate sump pump stations, including pump control and distribution panels, wiring, discharge piping, and a force main back-flow check valve. The scope includes landfill cover regrading and restoration, and other incidentals as necessary to complete the work as shown on the plans and as specified in the special provisions. Online Q&A - No Type of Award - Lump Sum

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents