Similar Projects
New Health Department Facility
New Construction
Design
$5,000,000 est. value
Hinesville, GA 31313

SR 38 Bypass From SR 38 / US 84 to SR 119
Infrastructure
Design
$20,000,000 CJ est. value
Walthourville, GA 31313

Elm Street and Windhaven Drive Sidewalks
Infrastructure
Bidding
$288,000 CJ est. value
Hinesville, GA 31313

Water System Improvements West of CSX Railroad
Infrastructure
Bidding
$2,000,000 CJ est. value
Hinesville, GA 31313

Outfall (NPRL) Line Extension to Taylors Creek
Infrastructure
Post-Bid
Hinesville, GA

South Main Street Widening Rebid
Infrastructure
Post-Bid
$12,000,000 CJ est. value
Hinesville, GA 31313

2021 LMIG Resurfacing
Infrastructure
Results
Hinesville, GA

Water System Improvements
Infrastructure
Results
$818,263 CJ est. value
Walthourville, GA 31313

Hunters Haven
New Construction, Infrastructure - 86,442 SF
Construction
$10,000,000 CJ est. value
Hinesville, GA 31313

Hunters Haven
New Construction, Infrastructure - 86,442 SF
Construction
$10,000,000 CJ est. value
Hinesville, GA 31313

Hyundai Mobis PE Systems / Richmond Hill
New Construction, Infrastructure - 500,000 SF
Pending Verification
$54,000,000 CJ est. value
Midway, GA 31320

Main Street Streetscape Phase III
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Hinesville, GA 31313

Comprehensive Maintenance Services
Infrastructure
Post-Bid

Water System Improvements
Infrastructure
Results
$1,478,531 CJ est. value
Walthourville, GA 31313

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Last Updated 08/10/2023 05:22 AM
Project Title

Wound Care Center

Physical Address View project details and contacts
City, State (County) Hinesville, GA 31313   (Liberty County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of site improvements for a new wound care center including clearing, grubbing, grading, paving, water system, and sewer system improvements. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. Bids for the complete work in one or more general contracts shall be made on the bid form provided and shall contain prices in words and figures for the work bid. All bids shall he accompanied by a Bid Bond drawn in favor of the Liberty Regional Medical Center, in the amount of at least five percent (5%) of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the Liberty Regional Medical Center. Each bond shall be equal to one hundred percent (100%) of the contract amount. The Bid Bond shall be forfeited to the Liberty Regional Medical Center as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within ten (10) days after being notified that he has been awarded the contract. The Owner reserves the right to reject any or all bids and to waive informalities. The work to be done consists of furnishing all materials, labor and equipment for construction of Liberty Regional Medical Center Wound Care Center complete with appurtenances, all as set forth in the Bid, as specified herein, and as shown on the Drawings. The time allowed for completion on all work to be done under this contract shall begin after notification by the Engineer to proceed with the work. Such notification will be issued upon completion of the contract arrangements, and in accordance with approved construction schedule, arranged to be within the contract time for completion. The time allowed for completion of the work is for 120 calendar days.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents