Similar Projects
RFP Engineering - Second Creek Farm and Oasis Parks, Trail Fitness Stations and Shade Structures
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Commerce City, CO 80022

Fairfax Park Drainage Outlet Reconstruction - City of Commerce City
Infrastructure
Conception
$4,950,000 CJ est. value
Commerce City, CO 80022

Butterfly Pavilion At Baseline
New Construction, Infrastructure - 81,000 SF
Design
$55,000,000 CJ est. value
Westminster, CO 80030

Riverdale Regional Park Arena
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Brighton, CO 80601

RFP Engineering - Elm Drive Drainage and Street Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Commerce City, CO 80022

CU Denver College of Engineering, Design, and Computing Building and North Classroom Renovations
New Construction, Renovation, Infrastructure - 72,000 SF
Post-Bid
$58,739,000 CJ est. value
Denver, CO 80204

Quebec Highlands Infrastructure
Infrastructure
Post-Bid
Thornton, CO 80602

Utah Park - Sidewalk and Bridge Abutment Repairs
Renovation, Infrastructure
Results
$300,000 to $335,000 est. value
Aurora, CO 80012

Painted Prairie Public Improvement Authority, Painted Prairie Town Center Park (Block 5)
Infrastructure
Results
$1,356,000 CJ est. value
Aurora, CO 80019

Riverdale Ridge High School CTE/STEM Center
New Construction, Infrastructure - 47,500 SF
Construction
$22,500,000 CJ est. value
Thornton, CO 80602

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

Kabin 2.0 North and South Buildings
New Construction, Infrastructure - 119,123 SF
Pending Verification
$38,400,000 CJ est. value
Denver, CO 80216

Regional Drainage Irondale OSP - City of Commerce City
Infrastructure
Conception
$1,600,000 CJ est. value
Commerce City, CO 80022

Parterre - Phase 1 - Future Sections
New Construction, Infrastructure
Design
$250,000,000 CJ est. value
Thornton, CO 80229

2022 Concrete Trails Program
Infrastructure
Post-Bid
$200,000 CJ est. value
Northglenn, CO 80233

Last Updated 07/18/2023 07:03 AM
Project Title

Ken Mitchell-Beebe Draw Pump House Rehabilitation

Physical Address View project details and contacts
City, State (County) Brighton, CO 80601   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,986,195 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000322277 Question Acceptance Deadline 06/22/2023 11:00 AM EDT Description The City seeks the bid of qualified respondents to provide services that shall rehabilitate the pump station and water line located near Ken Mitchell Park. The City owns a non-operational pump station in this area and expect that at the completion of this project it shall be used to pump raw water to the east end of the City in order to meet water use obligations. The Respondent shall be responsible for furnishing all labor, materials, supplies, tools/equipment, and all other things necessary for completion of the project in compliance with the civil construction plans and specifications General Requirements - Certification/Training - Contractors License Required - FOB Destination - Installation Required - Insurance Required - License Required - Warranty Information Required - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Procurement Point of Contact: Kelsey Archuleta Email Address: procurement@brightonco.gov The project shall include furnishing all labor, materials, and equipment for the supply, delivery, fabrication, installation, testing, and other materials and services required for the Ken Mitchell to Beebe Draw Pump House Rehabilitation project. Salient features include, but are not limited to: 1. Demolish pumping skid, pumps, piping, electrical control panels, and concrete floor from existing building. 2. Install helical piles to provide additional support for existing grade beams. 3. Cast new concrete floor over wet well to accommodate new pumps. 4. Install new pumps, piping, and surge tank in building. 5. Install new electrical panels, control panel, and instrumentation. 6. Install new lights. 7. Block in existing louver with new masonry block. 8. Install new HVAC system. 9. Insulate building and paint interior of building. 10. Install gutters and downspouts. 11.Patch concrete slab exterior of building where slab was demolished. 12.Install two (2) new air vac vaults in pump-back line. 13.Install one (1) new pressure sustaining vault in pump-back line. 14.Install a flow meter at the augmentation pipe outfall. 15.Rehabilitation/repair of existing eastern outfall structure if necessary (will require coordination with FRICO) 16.Any other work identified in the provided plans and specifications 17.Contractor will be responsible for coordinating with City of Brighton staff during all phases of the project. 18.Obtain all necessary permits required for construction of the project

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents