Similar Projects
Speed Bump Installation
Post-Bid
Irvington, NJ 07111

Well 5 Retrofit
Post-Bid
Burlington, NJ 08016

Wastewater Treatment Plant Replacement of Influent Pumps
Results
Riverton, NJ 08077

Hyson Road Water Treatment Plant Recycle Pump Repair and Replacement
Results
Jackson, NJ 08527

Supply and Delivery of Aurura Pumps
Post-Bid
Camden, NJ

SWPCF Potable Water Improvements
Results
$268,000 est. value
West Creek, NJ 08721

Backflow Preventers Repair and Calibration
Post-Bid
Berkeley Heights, NJ 07922

Lower Manasquan Pump Station Pump Rehabilitation and Check Valve Replacements
Results
$356,711 est. value
Howell, NJ

Well Testing, Sampling and Analysis
Post-Bid
Galloway, NJ 08205

Well House #8 Construction and Extension of Electrical System in the Borough of Collingswood
Results
$515,555 est. value
Collingswood, NJ 08108

Well 11 Improvements
Post-Bid
Livingston, NJ

Furnish and Deliver One (1) Jet Mixing Pump as Manufactured by Sulzer or Equivalent
Results
Linden, NJ 07036

On-Call Service Contract for Wet Well Cleaning
Post-Bid
Clinton, NJ

Well Maintenance and Repairs
Term Contract
Results
Bridgeton, NJ 08302

Wet Well Cleaning On-Call Service Contract
Post-Bid
Clinton, NJ 08809

Reported 12/27/2019 11:11 AM
Project Title

Rehabilitation of Water Supply Equipment and Construction of Lime Storage Addition - HTMUA Well No. 6 Contract No.7

Physical Address View project details and contacts
City, State (County) Mays Landing, NJ 08330   (Atlantic County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of various well supply and treatment components and erection of 176 square foot Lime Storage Addition at existing well facility #6 located on 19th street in Hamilton Township, Atlantic County, New Jersey. Includes the furnishing of all labor, materials and equipment necessary to complete the work. The work consists of various maintenance tasks related to the well supply and treatment equipment, the furnishing and installation of new lime slurry feed system, and the erection of a masonry addition over area of existing loading dock. The work is located on Nineteenth Street, Mays Landing, New Jersey.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents