Similar Projects
Reported | 01/27/2022 09:50 AM |
Project Title | Harold D. Thompson Wastewater Treatment Facility (HDT) - Aeration Basin 3 - Biological Nutrient Removal (BNR) |
Physical Address | View project details and contacts |
City, State (County) | Fountain, CO (El Paso County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | |
Project Status | Construction Nearing Completion |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The wastewater recycle line will also need to be modified per the engineering design of the zones. West Wall Nitrified Recycle Pipe Modifications: Work includes removal of the existing 12-inch diameter stainless steel and PVC pipe and fittings at the riser and drop pipe discharge, installation of new 12-inch diameter stainless steel and PVC pipe and fittings, installation of one 12-inch flanged plug valve with handwheel operator, associated stainless steel angle and bracket pipe supports with stainless steel hardware, and removal and reinstallation of the existing 2-inch sample tap/air release tapped to the new 12-inch stainless steel pipe. South Wall Nitrified Recycle Pipe Modifications: Work includes cutting of the existing 12-inch diameter PVC pipe and installation of a 12” x 12” x 12” PVC tee, installation of a new 12-inch riser/drop pipe discharge assembly consisting of new 12-inch diameter stainless steel and PVC pipe and fittings, one 12-inch flanged plug valve with handwheel operator, associated stainless steel angle and bracket pipe supports with stainless steel hardware, and installation of a new 2-inch sample tap/air release tapped to the new 12-inch stainless steel pipe. Basin #3 has been left unused since the treatment plant was opened. Aeration piping was recently installed in the basin along with the appropriate mixers. Different aeration zones will be turned on per the function of each zone. LFMSDD will drain basin #3 of all non-potable water before construction of the curtain walls and pipes. |
||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |