Similar Projects
RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
College Park, GA 30337

Microsoft Data Center / Palmetto
New Construction, Infrastructure, Alteration
Conception
$27,000,000 est. value
Palmetto, GA 30268

Fire Station 5 Construction
New Construction, Infrastructure - 10,912 SF
Design
$3,000,000 CJ est. value
Sandy Springs, GA 30328

260-270 Drummen Court Drainage Improvement and Maintenance
Infrastructure
Design
$257,664 CJ est. value
Sandy Springs, GA 30328

Graham Drive Pump Station Upgrades
Renovation
Bidding
$300,000 est. value
Fairburn, GA 30213

Global Impact Academy - Storm Drainage Improvement
Infrastructure
Bidding
$800,000 CJ est. value
Fairburn, GA 30213

Dredging Services
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Roswell, GA 30075

Nelms House - AYA Tower - SITE WORK
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
East Point, GA 30344

Krispy Kreme / Atlanta
New Construction, Infrastructure - 4,035 SF
Post-Bid
$1,400,000 CJ est. value
Atlanta, GA 30308

RFQ Construction Manager at Risk - Expansion of Tech Square, Phase IIIA
Addition, Demolition, Infrastructure
Post-Bid
$800,000 CJ est. value
Atlanta, GA 30334

CDBG Utility Building And Site Improvements
New Construction
Results
College Park, GA 30337

Atlanta-Newnan Road Pump Station and Force Main
New Construction, Infrastructure
Results
Atlanta, GA

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Kiddie Academy Mid-Town / Atlanta
Renovation, Infrastructure - 9,413 SF
Pending Verification
$1,378,500 CJ est. value
Atlanta, GA 30308

Garren
New Construction, Renovation, Infrastructure, Alteration - 160,000 SF
Conception
$20,000,000 est. value
Alpharetta, GA 30009

Last Updated 08/09/2022 04:09 AM
Project Title

Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Fairburn, GA 30213   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $508,915 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Fairburn will be receiving separate sealed Bids for all material, labor and equipment for the "Pump Station Improvements" project. This includes the following, with all related accessories as shown on the Construction Drawings and called for in the Contract Documents and Technical Specifications The City of Fairburn desires improvements to its four existing pump stations; Fireside, John Rivers, Evergreen, and Shaw. Improvements include components such as yard improvements, guide rails, safety grates, vent screens, yard hydrants, lights, pumps, and controllers. The estimated project cost is $300,000. This contract is Locally funded. City of Fairburn, 56 Malone Street, Fairburn, GA 30213 Contract Documents may be examined at the following locations: Integrated Science & Engineering, Inc., 1039 Sullivan Road, Suite 200, Newnan, GA 30265 ConstructConnect, 30 Technology Parkway South, Suite 100, Norcross, GA 30092 Georgia Procurement Registry Each Bidder is required to submit a "Construction Contractors Qualification Statement", "Bid Security", "Bid Form", Non-Collusion Affidavit", and "Security and Immigration Compliance Affidavit" as outlined in Section 00 22 13 "Supplementary Instructions to Bidders." The City of Fairburn will not issue or cause to be issued any addenda modifying the Project Manual or Construction Drawings within a period of 72 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and State of Georgia Legal Holidays. Each Bidder Must Deposit With His Bid, Security in the Amount of 5%, and Shall Be Subject to the Pump Station Improvements 00 11 13-2 1009.2104 Advertisement for Bids Conditions Provided in Section 00 21 13 "Instruction to Bidders. The City of Fairburn provides assurances to Bidder that all anticipated Federal, State, and Local Permits along with anticipated Rights of Way and Easements have been obtained.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents