Similar Projects
RFQ Construction Manager at Risk Services - Health Science Center
New Construction, Infrastructure - 175,000 SF
Bidding
$100,000,000 CJ est. value
Denton, TX 76209

2021 Street Improvement
Post-Bid
Argyle, TX

Upper Trinity Regional Water District Lake Ralph Hall Mitigation Project
Post-Bid
TX

Silverado West Phase 2 Paving Improvements
Results
Aubrey, TX

Bruton Orand Boulevard at FM 1171 - Right Turn Lane
Results
$252,742 est. value
Flower Mound, TX 75028

Presidium - Frisco Square
New Construction, Infrastructure
Construction
$60,000,000 CJ est. value
Frisco, TX 75033

Presidium - Frisco Square
New Construction, Infrastructure
Construction
$60,000,000 CJ est. value
Frisco, TX 75033

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

Aloft / Lewisville
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Lewisville, TX 75067

2021 Street Reconstruction Projects
Post-Bid
Aubrey, TX

Streambank Stabilization Timber Creek Central Park and Purnell Street Channel Repairs
Results
$1,164,089 est. value
Lewisville, TX 75067

Velvet Taco - Grandscape
New Construction, Infrastructure - 2,388 SF
Construction
$1,000,000 CJ est. value
The Colony, TX 75056

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2020 Street Bundle - Sector II
Results
$5,044,681 est. value
Denton, TX 76208

Frost Bank Denton Financial Center
New Construction, Infrastructure - 5,200 SF
Construction
$6,000,000 CJ est. value
Denton, TX 76205

Last Updated 09/22/2022 04:49 PM
Project Title

Tom Harpool Regional Water Treatment Plant (THRWTP) Diurnal Storage Pond Project

Physical Address View project details and contacts
City, State (County) Aubrey, TX 76227   (Denton County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Roadway Lighting, Sewage Treatment Plant, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generalluy consists of the construction of: A concrete-lined raw water Diurnal Storage Pond, An Inlet Structure vault with raw water piping, future connection tees with blind flanges, isolation valves, and a control valve, Outlet Structure with outlet structure intakes, piping, flow meter, level instruments, isolation valves, and a control valve, Overflow/Drain Structure with drain gates, weir gates, and controls, Yard piping for inlet, bypass, outlet, drain, overflow, and Emergency Pump Station return connections, Pond access roads, lighting, and maintenance water jets. Erosion improvements at the South Emergency Storage Lake. Removal of Finished Water Pump No. 1 Relocation of existing Finished Water Pump No. 3 to Finished Water Pump No.1 slot, adding a VFD. Installation of new Finished Water Pump No. 3 that matches Pumps No. 4 and 5.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents