Similar Projects
Contractor - Replace Boilers and Controls
Alteration
Design
$250,000 to $500,000 est. value
Pekin, IL 61554

James Street Pump Station and General HVAC, Structural, Electrical, and Mechanical Improvements
Infrastructure, Alteration
Bidding
$903,200 est. value
Plainfield, IL 60544

Construction Services for Millennium Station Boiler Replacement
Alteration
Bidding
$200,000 est. value
Chicago, IL 60601

Water Heater Replacement - Tech Building
Post-Bid
Ford Heights, IL 60411

Weatherization Program Refrigerators and Chest Freezers
Term Contract
Post-Bid
Morton, IL 61550

Boiler Blowdown Header Replacement
Results
Winnetka, IL

Wastewater Treatment Plant - Digester Leak Repair and Air Pipe Painting
Results
Libertyville, IL

SRE/ARFF Building at Decatur Airport
New Construction
Construction
Decatur, IL 62521

Furnish, Deliver and Install a Heating Boiler at the GH20 Sports Hub Aquatic Center
Alteration
Bidding
Glendale Heights, IL 60139

BRL MEP Upgrades - Division 01
Renovation
Post-Bid
Chicago, IL 60612

Manual High School Pool Filtration System
Results
Peoria, IL 61605

Outpatient Care Center (OCC) MRI#2 Replacement - Division 01
Post-Bid
Chicago, IL 60612

Boiler Replacement
Results
$243,300 est. value
Bement, IL 61813

West Aurora SD 129 Mechanical Unit Replacement
Post-Bid
Aurora, North Aurora, IL 60506

Steam Heater Replacement
Results
IL

Reported 07/15/2022 12:00 AM
Project Title

Clark House Boiler Replacement

Physical Address View project details and contacts
City, State (County) Princeton, IL 61356   (Bureau County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project entails the replacement of existing boilers, piping, heat pump loop pumps, and hydronic specialties. The new system shall consist of three (3) new high efficiency condensing boilers, with two (2) new variable speed pumps, new piping, expansion tank, and a 3- in-1 hydraulic separator. A new water softener shall be provided under an alternate bid.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents