Similar Projects
Last Updated | 07/12/2023 02:09 PM |
Project Title | Amherst Wastewater Treatment Plant Sludge Thickening Improvements - GC |
Physical Address | View project details and contacts |
City, State (County) | Hadley, MA 01035 (Hampshire County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work involves sludge thickening improvements that includes removal of an existing abandoned dissolved air flotation thickener (DAF), the installation of a new 3.0m gravity belt thickener (GBT), constructing new partition walls to enclose the GBT room, the replacement of an exterior window wall system with a new wall/window system, installation of a new concrete loading dock, and associated HVAC and electrical work. DCAMM qualifications in the General Construction category will be required. The estimated project cost is $3,100,000.00. The following trades will be filed sub bids due 6-15-2023 Masonry Work Metal Windows Glass & Glazing Painting Plumbing HVAC Electrical Work Addendum #1-#4 have been issued as of 6-26-2023. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |