Similar Projects
General Construction Services
Term Contract
Sub-Bidding
Laurel, MD 20707

Snow and Ice Removal Services
Term Contract
Sub-Bidding
Annapolis, MD 21401

Integrated Pest Management Pest Control Services at Various HABC Housing Developments
Alteration
Post-Bid
Baltimore, MD

Sandblasting, Painting, Grit Removal & Disposal
Term Contract
Post-Bid
Curtis Bay, MD 21226

Facility Maintenance, Repair, Operations (MRO) Services
Term Contract
Sub-Bidding
Hanover, MD 21076

Grit Removal and Disposal
Term Contract
Post-Bid
Curtis Bay, MD 21226

Snow Plow Services
Term Contract
Sub-Bidding
Bowie, MD 20715

Pest Management Services
Term Contract
Post-Bid
Glen Burnie, MD

Pressure Blast Cabinet
Term Contract
Sub-Bidding
Baltimore, MD 21226

Pest Control Service Contract
Alteration
Post-Bid
Hyattsville, MD 20781

RFQ Contractor - Trade Contractors - Prequalified
Term Contract
Sub-Bidding
Annapolis, MD 21401

Building Maintenance and Operations of Child Development Centers and Youth Center
Term Contract
Post-Bid
Joint Base Andrews, MD

PG County Materials Recycling Facility and Organics Compost Facility Waste Hauling Services
Term Contract
Sub-Bidding
Capitol Heights, MD 20743

Riparian Forest Buffer Site Preparation & Maintenance
Term Contract
Post-Bid
Annapolis, MD 21403

Overhead Door Inspection and Maintenance for State Highway Administration Hanover Maryland Complex
Term Contract
Sub-Bidding
Hanover, MD 21076

Last Updated 11/27/2022 11:39 PM
Project Title

Large Meter Vault Replacement Program

Physical Address View project details and contacts
City, State (County) Laurel, MD 20707   (Prince Georges County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 26th, 2022, project has not been awarded yet. It is expected to be awarded sometime after November 1st of this year. Performance Bond Yes Labor and Material Payment Bond Yes The Contract is to provide for the installation of, but not be limited to, the large meter vault, new meter, new water service, new water main connection, new valves by-pass piping, new valves, reconnection back to the existing water main serving the customer, sidewalk and pavement cutting and repair and site restoration, tree removal, and the demolition and/or removal of the existing water service, brick/concrete meter vault and meter. Alternatively, the Task Order could require rehabilitation of existing vaults that are found to be in serviceable/favorable rehabilitation conditions. This would call for the contractor to provide temporary bypass and perform work on the existing vault to extend the life of the vault and replace the old meter with a new meter type and renew the service line back to the main. The old large brick vault will be abandoned in place or removed, the existing meter will be salvaged and the existing service piping will be removed if the new service is installed in the same trench as the existing service. The existing tee and valve on the water main will be removed and replaced with a new section of water main or a flange cap will be installed on the tee after removing the valve. Each Task Order may typically include between one (1) to five (5) large meter vault and meter replacements to be completed. WSSC will bundle the large meter vault and meter replacements in somewhat close proximity to each other whenever possible. The replacement of the large meter vaults and meters for Montgomery County and Prince George's County School sites will be bundled together and will require the Contractor to replace the large meter vaults and meters only during the months of June to August when school is out of session. This construction restriction is so that heavy construction equipment for the installation of the vault and piping and the abandonment of the old brick vault and piping do not interfere with school access and safety.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents