Similar Projects
Pipe, PVC, Schedule 80 Various Sizes
Post-Bid
Houston, TX

Imperial Forest Section 5
Post-Bid
Houston, TX

Waterline to Serve Lift Station No. 3 and Spring ISD
Results
TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

East River Phase I
New Construction - 649,156 SF
Construction
Houston, TX 77020

Almeda & Orem RV Resort
New Construction - 4,448 SF
Construction
$3,700,000 est. value
Houston, TX 77045

Northwest Waterline Rehabilitation Phase 1 of 4
Alteration
Post-Bid
Jacinto City, TX

Booster Pump Replacement
Results

Clearing and Grubbing for Black Oak Phase 2
Infrastructure
Post-Bid

Newport Pointe Lift Station Phase 1
Results
TX

2021 Red Bluff Waterline Replacement Project
Infrastructure
Post-Bid
Seabrook, TX 77586

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Lift Station No. 8 Force Main Replacement
Infrastructure
Post-Bid
$279,815 est. value
The Woodlands, TX

Existing Lift Station Nos. 2 and 3 Electrical Modifications, Generator, and Motor Control Center Replacement
Results
$300,000 est. value
Houston, TX 77040

Storm Sewer, Sanitary Sewer and Water Lines to Serve Morton Creek Ranch Sections 24 and 26
Infrastructure
Post-Bid
TX

Last Updated 08/03/2022 07:36 AM
Project Title

HPW - 54-Inch Water Line along Galveston Road from HCFCD Channel No. B104-05-00 to Clear Lake City Water Authority Pump Station No. 3

Physical Address View project details and contacts
City, State (County) Houston, TX 77034   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents