Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management Project
Term Contract
Design
$10,000,000 est. value
Cedar Rapids, IA

Lat 11 Open Ditch Repairs
Infrastructure
Bidding
$137,030 est. value
Bancroft, IA

Pioneer Avenue SouthEast at Oakridge Drive Drainage Improvements
Infrastructure
Bidding
$110,000 est. value
Cedar Rapids, IA 52403

Wanatee Tributary Restoration
Infrastructure
Post-Bid
$147,000 est. value
Marion, IA

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

S-04 Drainage Improvements
Infrastructure
Bidding
$200,000 est. value
Johnston, IA 50131

Drainage District No 82 Open Ditch and Lateral B Cleanout
Infrastructure
Post-Bid
Algona, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

Reported 05/06/2022 12:00 AM
Project Title

Main Open Ditch Repair Joint Drainage District No. 1

Physical Address View project details and contacts
City, State (County) Ames, IA   (Story County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of two separate construction divisons with division 2 having three alternates. Division 1 consists of construction of approximately 259.5 stations of open ditch excavation, approximately 259.5 stations of spoil bank leveling, clearing and grubbing, riprap stabilization placement, repairs to surface drain pipes and tile extension pipes, and all other miscellaneous items related thereto. Division 2, Alternate A consists of approximately 259.5 stations of Seeding, Fertilizing, And Mulching for Hydraulic Seeding (Permanent Cool Season Mixture for Slopes and Ditches). Division 2, Alternate B consists of approximately 259.5 stations of Seeding, Fertilizing, And Mulching for Hydraulic Seeding (Native Grass and Forbs (Wildflower) Seeding). Division 2, Alternate C consists of approximately 259.5 stations of Seeding, Fertilizing, and Mulching for Hydraulic Seeding (Fertilizing, Mulching and Mixed Application Only. Native Grass and Forbs Seeding).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents