Similar Projects
Eighth Street- Lake Avenue to Woodmere - 882-18-CIP - City Of Traverse City
Infrastructure
Conception
$10,550,000 CJ est. value
Traverse City, MI 49684

Department of Public Services DPS Building Remodel - 1752 - City of Traverse City
Build-out, Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Traverse City, MI 49686

3566 North US 31 Multi Tenant
New Construction, Infrastructure - 6,800 SF
Design
$2,000,000 CJ est. value
Traverse City, MI 49684

Fairfield Hotel
New Construction, Infrastructure - 53,124 SF
Design
$14,000,000 CJ est. value
Traverse City, MI 49684

HMA Overlay Program (River Road and Nessen Road)
Infrastructure
Bidding
$400,000 CJ est. value
Traverse City, MI 49684

HMA Overlay and Add Shoulders
Infrastructure
Bidding
$200,000 CJ est. value
Grawn, MI 49637

Replacement of Municipal Water Service Lines for 244 Homes
Infrastructure
Post-Bid
$400,000 CJ est. value
Kingsley, MI 49649

US-31 Water Main Replacement Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Traverse City, MI 49686

2023 Madison Jefferson Reconstruction Project
Infrastructure
Results
$3,730,352 CJ est. value
Traverse City, MI 49684

Cedar Run Road Water Main Extention (Black Bear Farms Water System Consolidation Project)
Infrastructure
Results
$1,389,275 CJ est. value
Traverse City, MI 49684

Marriott Tribute
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Traverse City, MI 49684

Hammond Road Apartments
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Traverse City, MI 49686

New Headquarters and Operations Center - Bay Area Transportation Authority
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Traverse City, MI 49684

Overhead Line Improvements - 811 - City of Traverse City
Infrastructure
Conception
$4,050,000 CJ est. value
Traverse City, MI 49684

Self-Storage Facility/ Long Lake Township
New Construction, Infrastructure - 3 SF
Design
$5,940,000 CJ est. value
Garfield Township, MI 49684

Last Updated 06/13/2023 10:41 AM
Project Title

Union Street Dam Improvements - 168-19-CIP - City of Traverse City

Physical Address View project details and contacts
City, State (County) Traverse City, MI 49684   (Grand Traverse County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $19,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The goal of FishPass is to provide bi-directional movement of native and desirable fishes while removing or blocking invasive fishes on the Boardman River, Michigan. As part of the ongoing Boardman River Restoration Project, the Union Street Dam will be removed and replaced with a new and improved barrier. Below the barrier, a facility with multiple sorting channels and nature-like channel will be constructed as a place to demonstrate an integrated suite of technologies and techniques for selective fish passage and invasive species control. The project consists of a 1,481 square foot building with an office, fabrication room and public bathrooms is planned in the vicinity where a small cement block building currently exists. There are plans for connecting walks to adjacent parks and properties along with other features shown in the attached report. Approved by the Planning Commission for consistency with Master Plan on 1/3/17. As of June 13, 2023, this project is included City of Traverse City FY 2021-2026 CIP. This project is currently on hold. Information regarding design firm and general contractor selection or method of selection has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents