Similar Projects
Installation of a New Sanitary Sewer Pump Station and Abandonment of an Existing Sanitary Sewer Pump Station
New Construction
Bidding
$332,000 est. value
Woodstock, AL

Ed Love Raw Water Upgrades Phase 1 Construction
Renovation
Bidding
$450,000 est. value
Tuscaloosa, AL

Clements Road Water Booster Station Improvements Project
Post-Bid
Tuscaloosa, AL

Bob Jones Lift Station 2021 Improvements (Contract B)
Post-Bid
Scottsboro, AL

2019 CDBG Sewer Improvements
Results
Less than $229,030 est. value
Chatom, AL 36518

Baltzell Lift Station Elimination
Results
Anniston, AL 36202

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Pintlala Water System
Alteration
Construction
Hope Hull, AL

Birmingham Jefferson Convention Complex Storm Water Pump Station Replacement
Renovation
Bidding
$700,000 est. value
Birmingham, AL 35203

Well 39A Construction
Post-Bid
Montgomery, AL

Repair Lift Station And Oil Water Separators
Results
$500,000 to $1,000,000 est. value
Montgomery, AL 36108

Briarcliff Lift Station Improvements
Renovation
Bidding
$300,000 est. value
Florence, AL

Construction of the Drinking Water Test Well 8
Post-Bid
Dauphin Island, AL

2019 Water System Improvements - Contract B New Water Supply Well No. 3, Existing Well No. 2 Pump Rehabilitation
Results
Buhl, AL 35446

Water Supply Test Wells
Infrastructure
Bidding
$270,000 est. value
Clanton, AL

Reported 05/25/2022 12:00 AM
Project Title

New Clearwell and High Service Pump Station

Physical Address View project details and contacts
City, State (County) Valley, AL   (Chambers County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: New pre-stressed concrete clearwell, new high service pump station, new electrical building (E-house), filter underdrain replacement, yard piping and valves, electrical and controls, and civil/site work.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents