Similar Projects
Sky View High School Pool AHU and Mountain Crest High School Boiler Replacement Project
Bidding
Hyrum, Smithfield, UT 84335

Boiler
Bidding
Cedar City, UT

Hydraulic Pumps, Cylinders, Motors and Related Services
Term Contract
Post-Bid
Salt Lake City, UT

Millville Elementary School Chiller Project
Post-Bid
Millville, UT 84326

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Salt Lake City (SLC) Cooling Tower Mechanical Separator
Results
$25,000 to $50,000 est. value
Salt Lake City, UT

DFCM Construction - Pre Qualified Mechanical - DOH USL MOD 1 Autoclave Replacement
Bidding
$125,000 est. value
Taylorsville, UT 84129

Aquatic Center Boiler Replacement Project
Post-Bid
Roy, UT 84067

Pleasant Grove High School Boiler Replacement
Results
Pleasant Grove, UT 84062

Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

University of Utah High Temperature Water Converter Building 25
Term Contract
Results
$20,000 to $25,000 est. value
Salt Lake City, UT 84112

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

Annual Contract for Boiler Repairs
Term Contract
Results
Salt Lake City, UT 84115

Water Chiller Rental Unit - Hill Air Force Base
Term Contract
Post-Bid
Hill AFB, UT 84056

Construction: Westbrook Elementary, Boiler Replacement
Results
Taylorsville, UT 84129

Reported 11/27/2019 12:00 AM
Project Title

Design-Build Mechanical Upgrade at DISA

Physical Address View project details and contacts
City, State (County) UT   (Davis County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will remove one water cooled chiller and three cooling towers. Provide two closed circuit cooling towers identical to those replaced and connect them to the existing water cooled chillers. Re-size and replace three existing condenser pumps, three secondary-chilled water pumps, and three secondary-chilled water pumps. Add 1000 tons worth of air cooled chillers in the mechanical yard. Add a water to water plate and frame heat exchanger from the cooling tower condenser loop to the chilled water loop. Modify the primary chilled water loop to provide chilled water from all water/air cooled chillers to the IT secondary pumps and the admin secondary pumps. Create a new separate secondary chilled water loop from the expanded primary chilled water loop to supply the administrative load. The entire chilled water system design shall have complete 2N redundancy and be interconnected.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Cooling Towers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents