Similar Projects
Last Updated | 10/13/2021 02:14 PM |
Project Title | Replacement of 3rd Floor Door on Dewat Building South Cross SP5108 |
Physical Address | View project details and contacts |
City, State (County) | Saint Petersburg, FL 33715 (Pinellas County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Remove existing 3070 steel door and frame. 2. Remove roof flashing and roof cap sheet under threshold but do not cut or damage roof cap sheet. 3. Prepare door opening and install Cline 100BE 3070 ribbed aluminum door and frame with 12x12 Vision Lite (or approved equivalent) with multi-point exit device FE5400S (or approved equivalent) conforming to all current applicable local wind load codes. 4. Fit threshold and drill holes for anchors but do not attach threshold to floor. 5. Seal door per manufacturer’s specification (caulking and/or paint). 6. Verify performance and maintenance requirements with County Representative. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |