Similar Projects
HVAC Installation and Energy Infrastructure
Alteration
Post-Bid
Union City, CA

Highland Hospital Koret Building Exhaust Fan and Waterproofing
Alteration
Post-Bid
$1,900,000 est. value
Oakland, CA

Henry Robinson Multi-Purpose Center HVAC Replacement
Alteration
Results
$650,000 est. value
Oakland, CA 94612

Harvest Park Middle School Gym Boilers Replacements
Alteration
Results
Pleasanton, CA 94566

HVAC A-E and Construction Management Services
Renovation, Term Contract
Post-Bid
Less than $65,000,000 est. value
Livermore, CA 94550

HVAC Repairs
Alteration
Results
Oakland, CA 94612

District Wide Roofing and HVAC Replacement Project Package Five
Alteration
Post-Bid
Pleasanton, CA 94566

HVAC Repairs
Alteration
Results
CA

Regular and On-Call Heating, Ventilation, and Air Conditioning (HVAC) Services
Alteration
Post-Bid
Livermore, Martinez, Oakland, Oakley, Redwood City, Richmond, San Jose, San Pablo, Vallejo, CA 94603

USCG Alameda Replace HVAC and Roofs
Infrastructure
Results
$500,000 to $1,000,000 est. value
Alameda, CA

HVAC Services at Northern California DWR Facilities
Alteration
Post-Bid
Byron, CA 94514

Relocate HVAC Ductwork and Furnish and Install Fire/Smoke Dampers (Alameda County)
Alteration
Results
$388,000 est. value
Oakland, CA 94612

Air Intake Dampers Replacement Services
Alteration
Post-Bid
Oakland, CA 94612

O'Brien Hall HVAC Improvements
Alteration
Results
$160,000 est. value
Berkeley, CA

Hvac Preventive Maintenance And As Needed Repair Services
Term Contract
Post-Bid
CA

Last Updated 04/03/2023 01:32 AM
Project Title

OAK ATCT Water-to-Water Heat Pumps Replacement Project

Physical Address View project details and contacts
City, State (County) Oakland, CA 94621   (Alameda County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This requirement is for the replacement of four (4) Water-to-Water Heat Pumps at the Oakland Airport, California. The FAA is exempt from state and local taxes; this exemption, however, does not pass through to the contractor. The contractor therefore will be responsible for all state, local, and other applicable taxes. All contractors must have an active registration in SAM (sam.gov) in order to receive award. All contractors must be in compliance with Ensuring Adequate COVID Safety Protocols for Federal Contractors in SAM, per the attached hyperlink, (https://sam.gov/opp/a34bc81db63642a6ae27089e6c86f15b/view). This solicitation is a total small business set-aside for NAICS Code: 238220-Plumbing, Heating, and Air Conditioning. Small Business Size Standard: $19M The estimated Project Magnitude is between $500,000.00 and $600,000.00. Performance and Payment Bonds are required for this requirement. All pre-construction submittals must be approved before issuance of the Notice to Proceed (NTP). A site visit is scheduled for March 09, 2023, at 1:00pm PT. If you wish to attend, submit your name, company, and contact information for all attendees to Joni Haynes at Joni.l.haynes@faa.gov no later than February 27th, 2023, at 12:00pm PT. All questions regarding the SIR should be submitted in writing to Joni Haynes @ Joni.l.haynes@faa.gov no later than March 16th, 2023, at 5:00pm PT. Proposals are due no later than March 31st, 2023, at 5:00pm PT. Any proposal received after 5:00pm PT on March 31st, 2023, will be deemed non-responsive and will not be considered for award. 00001 The Architectural portion of the work is limited. The work includes patching and repairing interior finishes affected by the replacement of mechanical and electrical equipment. Mechanical includes replacing the water-to-water ground source heat pumps and integrating new heat pumps into the existing control system. Mechanical controls include integrating the new GSHP packaged controls using a BACnet network interface to integrate all necessary control and monitoring points into the existing Tracer Summit system. The Electrical scope includes replacing/reconnecting power circuitry where required to support the project's mechanical scope and providing new VFDs to selected mechanical equipment. Structural portion of work is limited. Structural is to provide new heat pump concrete housekeeping pads and anchorage. Pipe supports will be a delegated design provided by the Contractor, details provided as a general guideline to delegated design. This summary does not cover all aspects of the work. See other specification sections and the drawings for more detailed information. Electronic & IT: 03 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents