Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Electrical Work at Various Authority Owned Sites
Term Contract, Alteration
Bidding
Farmingville, NY 11738

District Wide Ventilation Upgrades - HVAC Work and Electrical Work
Alteration
Bidding
Less than $1,500,000 est. value
Dix Hills, NY 11746

Large Scale Renewables
Post-Bid

Led Price Sign Fabrication & Installation At Twenty-Four (24) Lna Service Stations
Post-Bid

Electrical Switchgear Testing and Maintenance at Downstate Facilities
Term Contract
Results
Hauppauge, Poughkeepsie, NY 12242

Replace Emergency Generators & Automatic Transfer Switches, Bldgs 20, 26, 72, 101, 702 & Portable at Pilgrim PC
Renovation
Results
$1,000,000 to $2,000,000 est. value
Brentwood, NY 11717

LED Price Signs Fabrication & Installation-NJ, NY & PA
Renovation
Post-Bid

North Sea Landfill Community Solar Development
Alteration
Results
Southampton, NY 11968

Interior Lighting Upgrades at Central Administration Building
Alteration
Post-Bid
Dix Hills, NY 11746

NEC Migration, Installation and Maintenance
Term Contract, Alteration
Results
NY

Huntington Town Hall Standby Generator
Alteration
Post-Bid
Huntington, NY

Emergency Generator, Buildings 45, 47 and 56
Alteration
Results
$500,000 to $1,000,000 est. value
Brentwood, NY 11717

Accabonac Solar Farm Pollinator Meadow
Infrastructure
Post-Bid
East Hampton, NY 11937

Building Wide Generator
Alteration
Results
East Setauket, NY 11733

Reported 12/22/2021 04:43 PM
Project Title

Our Lady of Consolation Generator Install

Physical Address View project details and contacts
City, State (County) West Islip, NY 11795   (Suffolk County)
Category(s) Medical, Single Trades
Sub-Category(s) Electric, Nursing/Rehabilitation Center
Contracting Method Competitive Bids.
Project Status Construction Commenced September 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project calls for the Demolition, New Construction with Site Work, Renovation/Remodel/Repair of a Clinic/Hospital/Medical.

Details

Nursing/Rehabilitation Center, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents