Similar Projects
Deruntz Avenue - City of Maryland Heights
Infrastructure
Conception
$2,350,000 CJ est. value
Maryland Heights, MO 63043

Deruntz Avenue - City of Maryland Heights
Infrastructure
Conception
$2,350,000 CJ est. value
Maryland Heights, MO 63043

Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Logan University Fuhr Science Center
Addition, Demolition, Renovation, Infrastructure - 14,400 SF
Design
$28,000,000 CJ est. value
Chesterfield, MO 63017

Fee Fee Road (Westport Plaza Drive to Schuetz Road)
New Construction, Infrastructure
Bidding
$1,452,746 CJ est. value
Maryland Heights, MO 63043

Fee Fee Road (Westport Plaza Drive to Schuetz Road)
New Construction, Infrastructure
Bidding
$1,452,746 CJ est. value
Maryland Heights, MO 63043

Deer Creek Greenway - Deer Creek Park Streambank Stabilization
Infrastructure
Post-Bid
Maplewood, MO

Mississippi Greenway - LKS Flood Repairs
Infrastructure
Post-Bid

West Hangar Drainage Improvements
Results
Chesterfield, MO 63005

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

The McKenzie
New Construction, Infrastructure
Construction
$107,500,000 CJ est. value
Saint Louis, MO 63124

The James / St. Louis
Demolition, New Construction, Infrastructure - 7,000 SF
Construction
$66,000,000 CJ est. value
Saint Louis, MO 63122

West Adams Avenue Condominiums / Kirkwood
New Construction, Infrastructure - 8,817 SF
Pending Verification
$2,000,000 CJ est. value
Kirkwood, MO 63122

Real Dill Pickleball Club At The District
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Chesterfield, MO 63005

Gill Hedda Broadview Daley - City of Maryland Heights
Infrastructure
Conception
$5,165,000 CJ est. value
Maryland Heights, MO 63043

Last Updated 01/24/2023 11:34 PM
Project Title

Breezemont Tributary - City of Maryland Heights

Physical Address View project details and contacts
City, State (County) Maryland Heights, MO 63043   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://files4.1.revize.com/marylandheightsmo/Admin%20and%20Finance/Budget%20Sections/2023/2023%20CIP%20Final.pdf This project stabilizes the channel and banks along the reach of Breezemont located in Brookside Subdivision common ground between Brookmont Drive on and Breezemont Drive/Foxwood Drive on the south, using grade control and bio-stabilization techniques. Existing storm sewer infrastructure located within tributary reach that is failed or in need of attention will be repaired or replaced. forestry practices may be used to restore and enhance the riparian Corridor. As of January 25, 2023, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. _________________ This project stabilizes the channel and banks along the reach of Breezemont located in Brookside Subdivision common ground between Brookmont Drive on and Breezemont Drive/Foxwood Drive on the south, using grade control and bio-stabilization techniques. Existing storm sewer infrastructure located within tributary reach that is failed or in need of attention will be repaired or replaced. forestry practices may be used to restore and enhance the riparian Corridor. This project is included City of Maryland Heights FY 2022 - 2026 Capital Improvement plan . As of March 05,2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents