Project Title | NDSP Effluent Reuse Facility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Casselton, ND 58012 (Cass County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $19,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DESCRIPTION OF PROJECT: The Work Generally consists of furnishing all labor, skill, equipment, and construction materials to construct a new Ultrafiltration (UF) and Reverse Osmosis (RO) facility for reclaim of treated wastewater for use at the North Dakota Soybean Processing Facility, in accordance with the plans and specifications. PLEASE NOTE: Site work will start this month. Building erection is expected November 2023 and project will complete June 2024. Technical bid questions shall be directed to Russ Sorenson, PE at 701-527-2451 or email at russ@PKG-inc.com. Only questions submitted by email and answered by addenda are binding to the bids. Bid packages: Bid Package No. 3a: Cast-in-Place Concrete Bid Package No. 3b: Precast Concrete Bid Package No. 5a: Metals Bid Package No. 7a: Membrane Roofing Bid Package No. 7b: Joint Sealants and Firestopping Bid Package No. 8a: Windows Bid Package No. 8b: Doors Bid Package No. 8c: Overhead and Coiling Doors Bid Package No. 9a: Finishes Bid Package No. 10a:Specialties Bid Package No. 22a: Mechanical Bid Package No. 26a: Electrical Includes installation of pre-procured equipment Bid Package No. 32a: Concrete Paving Bid Package No. 32b: Site Grading Bid Package No. 32c: Landscaping and Seeding Bid Package No. 32d: Site Concrete Bid Package No. 33a: Site Piping Bid Package No. 40a: Process Equipment Includes installation of pre-procured process treatment equipment Bid Package No. 26a: Hoist Systems Bid Packages Obtaining bid documents other than these Bid Documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining bid documents from any source other than directly from the source(s) listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued. Project Estimate: 18-19 Million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |