Similar Projects
Last Updated | 12/17/2020 01:56 AM |
Project Title | Highway Improvement Project CTH H from State Line to CTH ML (116th Street) |
Physical Address | View project details and contacts |
City, State (County) | Bristol, WI 53104 (Kenosha County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $723,000 |
Plans Available from | Engineer - 12/02/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Approximate quantities of work to be expected are as follows: 300 LF - Pavement Sawing 22,357 SY - Pulverizing Asphalt Pavement 559 CY - Excavation (Base Repair) 857 TON - 3" Crushed Aggregate Base 186 CY - Salvaged Pulverized Material 4,650 TON - HMA Pavement (3 MT 58-28 S) 2,400 TON - HMA Pavement (4 MT 58-28 S) 1,118 GAL - Bituminous Tack Coat 1,200 TON - ¾” Crushed Limestone Shoulder 16,700 LF - Pavement Marking Line Epoxy 4-Inch 50 LF - Pavement Marking Stop Line Epoxy 18-Inch 22 EA - Pavement Marking Bike Lane Symbol Epoxy 22 EA - Pavement Marking Bike Lane Arrow Epoxy 1 LS - Remove and Replace 30" Dia. Culvert 11 TON - Riprap 2 EA - Sanitary Manhole Adjustment 1 EA - Water Valve Box Adjustment |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |