Similar Projects
MetraPark Expansion
Addition
Conception
Billings, MT 59101

Spring Creek Park Subdivision
New Construction
Conception
Kalispell, MT 59901

Maintenance, Alteration, and Repair Services (MARS)
New Construction
Design
Rockville, MD - Hamilton, MT 20852

Little Sheep Cabin Renovation
Renovation
Design
$250,000 to $500,000 est. value
Lima, MT

MDT Wolf Point Hq Office Remodel
Build-out
Bidding
$200,000 CJ est. value
Wolf Point, MT 59201

Region 4 Annex Building Janitorial Services
Term Contract
Sub-Bidding
Great Falls, MT 59405

Region Four Headquarters Front Desk Security
Renovation, Alteration
Post-Bid
$78,000 est. value
Great Falls, MT

Design-Building Contracting Teams Florence-Carlton School District - RFQ
New Construction, Alteration
Post-Bid
Thompson Falls, MT 59873

Construction of a New Transit facility
New Construction - 3,360 SF
Results
Livingston, MT

Deer Lodge Sand Salt Cover Structure
New Construction
Results

Family Dollar
New Construction, Demolition - 25,593 SF
Construction
$750,000 est. value
Wolf Point, MT 59201

Silo Development
New Construction
Conception
Bozeman, MT 59718

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Big Horn Industries Exterior Upgrades and Little Big Horn Center Interior Remodel
Renovation
Results
$1,300,000 est. value
Hardin, MT

Animal Control Lead Architectural Services
Addition, LEED Certification, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Missoula, MT 59808

Last Updated 08/01/2022 04:08 PM
Project Title

RFP - Mullan Area Master Plan

Physical Address View project details and contacts
City, State (County) Missoula, MT 59802   (Missoula County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected April 2020
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Missoula County and the City of Missoula are seeking a multidisciplinary team to complete a multi-part planning and design process for roughly 2,000 acres. With oversight from city and county staff, the selected consultant(s) will lead the planning process and develop project deliverables as outlined within this RFP. The intent of the scope of services is to serve as a framework, which consultants can use to develop a more detailed proposed scope of work based on their professional expertise and knowledge. The final scope of work will be negotiated with the selected consultants in conjunction with city and county staff prior to contract approval. The consultant is expected to provide interpretation and identification of deliverables or milestones it believes are integral to the project in the submitted proposal, as outlined within the submittal requirements section of this RFP. Direct questions to: Karen Hughes khughes@missoulacounty.us 406-258-4657 October 7, 2019 - Deadline for submitting questions October 15, 2019 - Responses to questions released December 13, 2019 - Contract negotiations complete Following dates dependent upon final scope of work: January 31, 2020 - Existing conditions analysis complete April 30, 2020 - 75% draft master plan June 26, 2020 - Draft master plan and zoning designations July 2020 - Planning Board public hearing August 2020 - Revisions September 2020 - City Council and County Commissioner hearings October 1, 2020 - Master Plan and Zoning adopted

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents