Similar Projects
New Wastewater Treatment Plant
New Construction
Conception
Milton, FL

Southwest Water Treatment Plant - U22SWT - City Of North Port
New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
North Port, FL 34287

Northwest Wastewater Plant Operations Building
New Construction - 1,500 SF
Design
$8,000,000 to $10,000,000 est. value
Tampa, FL

Flagler Beach Wastewater Treatment Plant
New Construction
Design
Flagler Beach, FL

Waste Water Treatment Facility Improvements - Phase 2
Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
Davenport, FL 33837

Rehabilitation of South Clarifier at Waste Water Treatment Plant #3
Renovation
Bidding
$300,000 CJ est. value
Winter Haven, FL 33884

Supply of Liquid Chlorine
Term Contract
Sub-Bidding
Jupiter, FL 33458

Hydrofluosilicic Acid
Term Contract
Sub-Bidding
Orlando, FL 32801

Construction Package ST-2D-B South District Wastewater Treatment Plant Substations 5/6 and 15/16
New Construction
Post-Bid
$22,382,300 est. value
Miami, FL 33170

Lake Wales WRF Vacuum Truck Sludge Drying Bed
Renovation
Post-Bid
$418,000 est. value
Lake Wales, FL

Northview High School - Wastewater Treatment Plant
Results
$600,000 est. value
Century, FL 32535

Wastewater Treatment Plant
Results
Less than $1,732,450 est. value
Starke, FL 32091

Airport Water Reclamation Facility Phase III Expansion
Construction
Brooksville, FL 34613

WWRF Biological Treatment Improvements - City of Largo
Renovation
Construction
$53,523,250 CJ est. value
Clearwater, FL 33760

Waste Water Treatment Facility Expansion
Addition
Pending Verification
Clermont, FL

Last Updated 08/17/2022 11:10 AM
Project Title

Greenland Water Reclamation Facility (WRF)

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32256   (Duval County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected July 2020
Bids Due View project details and contacts
Estimated Value $150,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 2022, construction is underway.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents