Similar Projects
O'Reilly Auto Parts (BN2) / Benton
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Benton, AR 72015

Road Runner #1043 Renovation
Addition, Renovation, Infrastructure
Design
$800,000 CJ est. value
Bryant, AR 72022

Districts 1 and 2 Bridge Preservation (2023) (S)
Infrastructure
Bidding
$5,600,000 CJ est. value
East End, AR 72065

Districts 1 and 2 Bridge Preservation (2023) (S)
Infrastructure
Bidding
$5,600,000 CJ est. value
East End, AR 72065

Construction of the Windcone and Segmented Circle Relocation Project at the Saline County Regional Airport
Infrastructure
Post-Bid
Bryant, AR 72022

Mill and Asphalt Overlay of East Sevier Street
Infrastructure
Post-Bid
Benton, AR 72015

Sevier Street - Geyer Springs Road (CONC PVMNT PRES)
Infrastructure
Results

Springlake Roundabout
Infrastructure
Results
Benton, AR

Pinnacle Point at Bryant
New Construction, Infrastructure - 82,000 SF
Construction
$22,000,000 CJ est. value
Alexander, AR 72002

Pinnacle Point at Bryant
New Construction, Infrastructure - 82,000 SF
Construction
$22,000,000 CJ est. value
Alexander, AR 72002

Aria Convenience Store
New Construction, Infrastructure - 3,500 SF
Pending Verification
$1,000,000 CJ est. value
Bryant, AR 72022

Midtown Bryant - Phase 3
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bryant, AR 72022

Hamburg Overlay (S)
Infrastructure
Bidding
$4,000,000 CJ est. value
East End, AR 72065

High Performance Cold Mix
Infrastructure
Post-Bid

Statewide CLRS Improvements
Infrastructure
Results

Last Updated 03/30/2023 11:26 AM
Project Title

Runway 2-20 Sealcoat

Physical Address View project details and contacts
City, State (County) Bryant, AR 72022   (Saline County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $143,720 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Saline County Regional Airport Commission will receive sealed bids for the construction of the Runway 2-20 Sealcoat project at the Saline County Regional Airport. The work is generally described as follows: Project includes cleaning cracks and sealcoating Runway 2-20. Bid security in the form of a bid bond, certified check, or other negotiable instrument equivalent to five percent (5%) of the total bid is required and shall be made payable to the Saline County Regional Airport Commission. Contract security in the form of 100% Performance and Payment Bonds will be required. Other federal provisions in the contract documents include, but are not limited to the following: Affirmative Action Requirement: 1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth in the contract documents. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for minority participation: 16.4% Goals for female participation in each trade: 6.9% A DBE contract goal of 18.4% percent has been established for this contract. The bidder/offeror shall make good faith efforts, as defined in Appendix A, 49 CFR Part 26 (Attachment 6), to meet the contract goal for DBE participation in the performance of this contract. Mechanics and laborers on the project shall be paid not less than the minimum hourly rates set out in Wage Determination No. AR20200175, U.S. Department of Labor, a reproduction of which is bound in the contract documents. The Saline County Regional Airport Commission reserves the right to waive any informalities or irregularities in the bids received and to reject any or all bids or to award or refrain from awarding the contract for the work, whichever is deemed to be in the Owner's best interests.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents