Similar Projects
Wastewater Dewatering System
New Construction
Bidding
Bayard, NM

On-Call Construction Services
Post-Bid
Albuquerque, NM 87107

Rehabilitating and/or Developing New Wastewater Collection Infrastructure
Post-Bid
Jemez Pueblo, NM 87024

Wastewater Treatment Plant New Effluent Line 2019
Results
Los Lunas, NM 87031

Chama Wastewater Treatment Lagoon Closure - Phase II
Results
Less than $442,500 est. value
Chama, NM 87520

Edgewood Wastewater Treatment Plant Improvements Package 1
Post-Bid
Edgewood, NM 87015

Construction of the Acomita WWTP Expansion Project
Results
Acomita, NM 87034

Wastewater Treatment Plant (WWTP) - Equipment Procurement
Post-Bid
Edgewood, NM 87015

Rotary Drum Thickener Facility
Term Contract
Results
Albuquerque, NM 87102

Wastewater Treatment Facility
Post-Bid
Jemez Pueblo, NM 87024

Alto Crest Water Treatment Plant (Plant 3) Rehabilitation
Results
Less than $3,529,000 est. value
Ruidoso, NM 88345

Wastewater System Operations and Maintenance
Post-Bid
Sandia Park, NM

Construction Services to Upgrade the Wastewater Aeration System at the Paseo Real Wastewater Treatment Plant
Results
$10,753,875 est. value
Santa Fe, NM 87505

Pueblo Los Cerros Homeowners Association - Sewage Treatment Plant Replacement
New Construction, Renovation
Post-Bid
Corrales, NM 87048

Bayard Wastewater Treatment Plant Sludge Dewatering Facilities
Results
Bayard, NM 88023

Reported 01/25/2020 12:00 AM
Project Title

Wastewater Lagoon Improvements Phase 3

Physical Address View project details and contacts
City, State (County) Santo Domingo Pueblo, NM 87052   (Sandoval County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the renovation of two existing wastewater treatment cells with water surface areas of 3.17 and 2.26 acres. The contractor shall remove and transport existing sludge, vegetation and concrete from each cell to an approved disposal site, reshape the berms of each cell, and install HDPE liner with gas venting system in both cells.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents