Similar Projects
P1202 Union Station Replace Fire Detection and Alarm System
Alteration
Bidding
Seattle, WA

Airport Fire Suppression System Services
Renovation, Alteration
Post-Bid
Everett, WA

STA Plaza Fire Sprinkler Head Replacement
Alteration
Post-Bid
$138,000 est. value
Spokane, WA 99201

Fire Alarm Maintenance And Repair Service
Renovation, Alteration
Results
Vancouver, WA 98686

Fire Detection and Suppression
Term Contract
Results
$305,746 est. value
Olympia, WA 98501

Fire Suppression, Fire Alarm, Fire Sprinkler Systems Inspection, Testing, Maintenance (ITM) and Repair
Alteration
Post-Bid

Public Schools Fire And Security System Maintenance Repair And Installation
Alteration
Results
Federal Way, WA

Install Fire Notification Devices
Infrastructure, Alteration
Post-Bid
Fairchild Air Force Base, WA

Design Build Services New Campus Fire Protection and Domestic Water Reservoir
Infrastructure, Alteration
Results
Pullman, WA 99163

Building 2565 Sprinkler System Replacement
Alteration
Post-Bid
$261,250 to $288,750 est. value
Vancouver, WA 98660

Fire Suppression and Testing
Alteration
Results
WA

Unit Pricing - Fire Sprinkler Head Inspection and Testing Project
Alteration
Post-Bid
$70,000 est. value
Vancouver, WA 98660

Fire Station #5 Hose Tower Demolition and Renovation
Demolition, Alteration
Results
$175,000 to $210,000 est. value
Bellingham, WA 98225

Fire Hoses and Nozzles Service
Term Contract
Post-Bid
Fairchild Air Force Base, WA

Fire Extinguisher Maintenance and Inspection
Term Contract
Results
$60,000 est. value
Vancouver, WA

Last Updated 03/25/2022 09:49 AM
Project Title

Fire Alarm System Upgrade at Meadows on Lea Hill

Physical Address View project details and contacts
City, State (County) Auburn, WA 98092   (King County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $238,703
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, but is not limited to, removal of existing fire alarm control panel and all devices; provide a new fire alarm control panel and all devices as listed, install prefabricated plastic cove molding along both sides of all hallways.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents