Similar Projects
Hydraulic Pumps, Cylinders, Motors and Related Services
Term Contract
Post-Bid
Salt Lake City, UT

Temporary Heating Systems
Post-Bid
Salt Lake City, UT

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Salt Lake Sports Complex Ammonia Chiller Replacement
Results
$300,000 to $500,000 est. value
Salt Lake City, UT 84108

Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Children's Center Boiler Replacement Family Health Building Department of Health
Results
$450,000 est. value
Salt Lake City, UT

Riverton High School Boiler Replacement
Term Contract
Results
Riverton, UT 84065

DFCM Construction-Pre Qualified Mechanical-Utah National Guard Mechanical Upgrades Draper JFHQ Building
Results
Less than $292,000 est. value
Draper, UT 84020

SLCC MC - Boiler Replacement
Results
$225,000 est. value
Sandy, UT 84070

Salt Lake City (SLC) Cooling Tower Mechanical Separator
Results
$25,000 to $50,000 est. value
Salt Lake City, UT

Adult Detention Center Water Heater Replacement
Results
$100,000 to $130,000 est. value
UT

Boiler Remodel for Draper City
Results
Draper, UT 84020

CAB West Mechanical Make-up and Exhaust
Term Contract
Results
Granite, Sandy, UT 84070

Construction-Pre Qualification-General/Mechanical/Electrical/Roofing/Pavingcontractors
Results
Less than $3,500,000 est. value
Salt Lake City, UT

SLCC Mechanical Controls Upgrade
Results
$600,000 est. value
Salt Lake City, UT 84130

Last Updated 08/15/2019 05:50 PM
Project Title

Boiler and Motor Pumps Upgrade

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84114   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project describes Upgrade two boilers at the end of their life with new efficient boilers and dampers. 1.Replace two (2) large existing boilers with three (3) smaller boilers. 2.Replace every air handler’s OSA and Return Air damper including new actuators (34 dampers total). 3.Add Alternate #1: Replace the two main heating water pumps and their VFD’s. 4.Add Alternate #1: Replace every air handler’s circulation pump (34 pumps total)
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Pumps, Heating Boilers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents