Similar Projects
CDBG ADA Ramps
Infrastructure
Bidding
$800,000 est. value
Thornton, CO

Myec Zuni Parking Lot and HVAC
Post-Bid
Denver, CO 80211

Curb and Gutter Replacement
Infrastructure
Post-Bid
CO

New Park at 88th Avenue and Santa Fe Drive
Results
$1,000,000 to $1,500,000 est. value
Thornton, CO 80260

Hooker Street Pedestrian Lights at Westminster Station
Results
Westminster, CO 80003

Parking Lot Asphalt Replacement - Pool Building
Infrastructure
Post-Bid
Brighton, CO 80601

2020/2021 CDBG ADA Ramps Program
Results
Brighton, CO

East 58th Avenue Improvements
Infrastructure
Post-Bid
CO

Adams County Impound Lot Expansion
Results
Brighton, CO

2022 Concrete Trails Program
Infrastructure
Post-Bid
Northglenn, CO

Rocky Mountain Elementary Sidewalk Project
Results
Less than $506,985 est. value
Westminster, CO 80031

2022 Transportation Preservation and Improvements
Infrastructure
Post-Bid
Brighton, CO

2021 Concrete Trails Program
Infrastructure
Results
Northglenn, CO

Cole Arts and Science Academy Safe Routes to School
Infrastructure
Post-Bid
$600,000 to $730,000 est. value
Denver, CO

2021 Citywide ADA Ramp and Concrete Repair 3
Infrastructure
Results
$3,800,000 to $4,200,000 est. value
Denver, CO

Reported 06/03/2022 12:00 AM
Project Title

Repair Concrete Curbs, Walkways, and Ramps

Physical Address View project details and contacts
City, State (County) Aurora, CO 80045   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all necessary services, equipment, labor, materials, supervision, and tools to perform construction services to t to install several concrete walkways and wheelchair curb cuts throughout the Rocky Mountain Regional VAMC . LINE ITEM 1: o Contractor shall furnish and install a concrete 6' wide by 4" thick tertiary walkway beginning at the northeast corner of the Parking Staff North (PSN) garage, running north approximately 94 feet, and terminating at an existing VA owned sidewalk that will service the new Psychiatric Residential Rehabilitation Treatment Program (PRRTP) building and the Fisher House. Reference attached detail. o Proposed path of sidewalk runs east of a peninsula containing a curb-surround and landscaping stone. Contractor shall remove and dispose of existing landscaping stone as necessary. o Proposed path of sidewalk runs adjacent to a monument sign. Contractor shall taper or angle termination of sidewalk as necessary to keep clear of sign. o Contractor shall compact and tamp soil, set forms, and pour and grade walkway. o Contractor shall follow the VA Site Design manual and all applicable specification sections in the installation of this walkway. LINE ITEM 2: o Contractor shall furnish and install a concrete 6' wide by 4" thick secondary walkway beginning at the sidewalk at the southeast corner of the RMRVAMC campus 70' west of Fitzsimons Parkway, running eastward north of two Xcel Energy transformers, turning northeast at a 45 degree angle, and terminating in the existing north-south sidewalk on the west side of Fitzsimons Parkway, a total of approximately 120 linear feet. Reference attached detail. o Contractor shall remove and dispose of existing compacted soil and sod. o Contractor shall compact and tamp soil, set forms, and pour and grade walkway. o Contractor shall follow the VA Site Design manual and all applicable specification sections in the installation of this walkway. LINE ITEM 3: o Contractor shall furnish and install a concrete ADA compliant wheelchair curb cut at the pedestrian island at the south entrance of the RMRVAMC campus, allowing wheelchair egress from the island across the drive leading into the Parking Visitor South (PVS) garage and toward the sidewalk outside Clinic Building South (CBS.) Reference attached detail and typical existing curb cut detail. o Contractor shall furnish and install an additional ADA compliant wheelchair curb cut on the sidewalk outside CBS creating a pedestrian crossing from the island to the CBS sidewalk. o Contractor shall saw cut, grade, finish, and paint safety yellow or similar to match existing wheelchair curb cuts. o Contractor shall stripe newly created pedestrian crossing to match existing on site per specifications. o Contractor shall furnish and install pedestrian crossing signs for traffic entering and exiting the underground portion of the PVS garage per specifications and VA Signage Design Manual. o A snowmelt system is installed in the drive leading underground to the PVS garage directly adjacent to the area of the proposed cuts. Contractor shall take all precautions not to disturb or damage this system. o Contractor shall follow the VA Site Design manual, VA Barrier Free Design Guide, VA Signage Design Manual, ADA requirements, and all applicable specification sections in the installation of this pedestrian crossing.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents