Similar Projects
Antioch Summit
New Construction, Infrastructure - 139,237 SF
Conception
$38,000,000 CJ est. value
Stone Mountain, GA 30088

Dresden Townhomes
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Atlanta, GA 30341

Fairfield Inn and Suites / Stone Mountain
New Construction, Infrastructure - 67,085 SF
Design
$10,000,000 CJ est. value
Stone Mountain, GA 30087

SR 10 / US 278 Fm CS 721 / Ashton Place to CR 5206 / Sams Crossing
Infrastructure
Design
$5,000,000 CJ est. value
Avondale Estates, GA 30002

WD Thomson Park Drainage Improvements
Infrastructure
Post-Bid
$426,462 CJ est. value
Decatur, GA 30033

WD Thomson Park Drainage Improvements
Infrastructure
Post-Bid
$426,462 CJ est. value
Decatur, GA 30033

Valve Boxes and Risers (Three (3) Year Multiyear Contract)
Term Contract
Results
Stone Mountain, GA 30083

Fitzgerald Park Infrastructure Project
Infrastructure
Results
Tucker, GA 30084

Chamblee International Logistics Park
New Construction, Infrastructure - 256,000 SF
Construction
$45,000,000 CJ est. value
Atlanta, GA 30341

Andy's Frozen Custard / Atlanta - Rebid
Demolition, New Construction, Infrastructure - 2,651 SF
Construction
$800,000 CJ est. value
Atlanta, GA 30329

The Tennis Center Project
New Construction, Infrastructure - 30,000 SF
Pending Verification
$50,000,000 CJ est. value
Stone Mountain, GA 30087

Lawrenceville Highway Townhomes
New Construction, Infrastructure
Pending Verification
$33,000,000 CJ est. value
Tucker, GA 30084

Kathryn Avenue Bridge Replacement - City of Decatur
Demolition, New Construction, Infrastructure
Conception
$350,000 CJ est. value
Decatur, GA 30030

East College Avenue Mixed-Use Development
New Construction, Infrastructure - 18,000 SF
Design
$30,000,000 CJ est. value
Decatur, GA 30030

Laurel Ridge ES, Woodridge ES, Chesnut ES, and Druid Hills MS Major Building System Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$17,134,538 CJ est. value
Decatur, GA 30033

Last Updated 07/12/2023 10:50 AM
Project Title

Consent Decree - Find and Fix Assessment and Rehabilitation (CD - FFAR) (Multiyear Contract)

Physical Address View project details and contacts
City, State (County) Decatur, GA 30030   (DeKalb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 12, 2023, a bid tabulation for this project has not been released as bids are currently under evaluation. A timeline for award has not been confirmed. Per the Consent Decree (CD) entered with the United States Environmental Protection Agency, the County is implementing continuous sanitary sewer assessment and rehabilitation aimed at minimizing sanitary sewer overflows (SSOs). Pursuant to this effort, DWM has developed the Priority Areas Sewer Assessment and Rehabilitation Program (PASARP) to provide for the identification, delineation, prioritization and rehabilitation of priority areas within DWM's WCTS and the Ongoing Sewer Assessment and Rehabilitation Program (OSARP). The OSARP is to provide for the identification, delineation, prioritization, and rehabilitation of the remaining areas within DWM's WCTS as well as the ongoing maintenance of the entire WCTS. This contract is to address urgent sanitary sewer rehabilitation needs identified through assessment in the OSARP and the Maintenance Management System (MMS) Program. Additional assessment may include CCTV (to 18-inch diameter) or TISCIT of assets and rehabilitation methods may include external and internal point repairs (to 24-inch diameter), cured-in-place pipe lining (to 24-inch diameter), manhole rehabilitation, locating, exposing, and raising manholes. Also included are supporting work items including site restoration, access, erosion control, and bypass pumping.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents