Similar Projects
Holley Ferry-Spann Road Water Improvements Phase II Contract 2 - Elevated Storage Tank
Infrastructure
Bidding
$300,000 est. value
Saluda, SC

Marion Waste Water Treatment Plant (WWTP) Protection Berm
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Marion, SC 29571

Termite Inspection and Treatment Services
Term Contract
Sub-Bidding
Charleston, SC 29401

Cooling Tower Water Treatment Services
Term Contract
Sub-Bidding
Beaufort, SC 29902

Fy21 Construction of Lake Marion Water Tower
Post-Bid
$1,000,000 to $5,000,000 est. value
Harleyville, SC

Underground Storage Tank
Post-Bid
SC

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

McBee Elevated Tank Rehabilitation Project
Infrastructure
Bidding
$600,000 est. value
McBee, SC

Wastewater Treatment Plant Sludge Dewatering And Clarifier Upgrades
Post-Bid
$1,800,000 est. value
Bishopville, SC

Heath Springs WWTF Improvements
Results
$800,000 to $1,200,000 est. value
Heath Springs, SC 29058

Elevated Water Tank Project
Infrastructure
Bidding
$800,000 est. value
Awendaw, SC

Marco Rural Water Tank Rehabilitation
Post-Bid
SC

Murrells Inlet WWTP Clarifier Rehabilitation
Results
Georgetown, SC

Contractor - Grimball Storage Tank Rehabilitation Project
Infrastructure
Bidding
$400,000 est. value
Charleston, SC

Last Updated 07/22/2022 10:32 AM
Project Title

RFQ Contractor - Final Settling Tanks Machine Guards Charleston Water System (CWS)

Physical Address View project details and contacts
City, State (County) Charleston, SC 29412   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Storage/Water Tanks
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Request for Qualifications For Final Settling Tanks Machine Guards Charleston Water System (CWS) invites interested contractors to complete a pre-qualification package for providing all labor, material, and equipment necessary for the construction of the "Final Settling Tanks Machine Guards" project. The Work to be performed consists of, but is not limited to, fabrication and installation of aluminum machine guards for drive mechanisms at final settling tanks at a wastewater treatment plant, and modifications to chain tensioners and all associated appurtenances. The Contractor shall provide all labor, equipment, and materials necessary to complete the Work as described herein and indicated on the Contract Drawings. To be eligible to bid this project, Contractors must be prequalified for this project by the Commissioners of Public Works. Prequalified Contractors have been notified of their eligibility to bid.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents