Similar Projects
Reported | 10/11/2021 08:06 AM |
Project Title | Lift Station No. 20 Replacement |
Physical Address | View project details and contacts |
City, State (County) | Palm Beach Gardens, FL (Palm Beach County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | |
Project Status | Permitting, Construction Start Expected January 2021, No Sub Bids Needed |
Bids Due | View project details and contacts |
Estimated Value | $1,737,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work is generally described as follows: The replacement of the existing Lift Station No. 20, located in Cabana Colony of Palm Beach Gardens, with a new triplex lift station including three (3) submersible pumps, 12-foot diameter wet well with accessories, manholes, gravity sewer mains, force mains, concrete work, fencing, standby generator, electrical and instrumentation work, and a relocated odor control system. The existing station will be demolished, including removal of pumps, control panels, concrete, and supports. This project includes all necessary restoration of areas affected by construction activities to existing conditions or better. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |