Similar Projects
Old Town Water System Rehabilitation Phase 2
Infrastructure
Results
$1,618,468 CJ est. value
Hanna, WY 82327

Northern Arapaho Business Council Industrial Park Lift Station
Demolition, New Construction, Infrastructure
Results
$321,300 CJ est. value
Arapahoe, WY 82501

RFQ D/B - Design-build Services of Central High School Riske Field Track Replacement
Infrastructure
Post-Bid
$38,670 CJ est. value
Cheyenne, WY 82009

Transfer Station Lift Station Upgrade or Replacement
Renovation
Post-Bid
$88,425 CJ est. value
Cheyenne, WY 82007

Plumbing Contractor Services
Term Contract
Post-Bid
Cheyenne, WY 82001

Air Compressor and Installation
Renovation
Post-Bid
$50,000 CJ est. value
Cheyenne, WY 82001

Plumbing Parts
Term Contract
Post-Bid
Cheyenne, WY 82001

Casper Regional Landfill Leachate Force Main Extension
Infrastructure
Results
$174,038 CJ est. value
Evansville, WY 82636

As Needed Minor Plumbing Repairs, Maintenance, Servicing, Diagnostics, Inspections and/or Certification at Thyra Thomson Building
Term Contract
Post-Bid
Casper, WY 82601

Sam H. Hobbs WWTP Secondary Treatment Facilities Rehabilitation Project, Phase 2
Infrastructure
Results
$51,995 CJ est. value
Casper, WY 82609

Replace 4 Water Heaters at Cody Middle School (CMS)
Renovation
Design
$200,000 CJ est. value
Cody, WY 82414

Water and Sewer Improvements- South Street Water Main Extension and 11th Street Sewer Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
Wheatland, WY 82201

Scott A Mohror
Infrastructure
Post-Bid
$330,000 CJ est. value
Jackson, WY 83001

Last Updated 06/30/2023 07:35 AM
Project Title

Wastewater Treatment Plant Cell Bypass Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Douglas, WY 82633   (Converse County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,289,701 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

From Exit 140 on I-25, stay in the right lane and follow the off ramp to the first stop light at the intersection of Hwy 59. Turn right and follow Riverbend Road to Richards Street then turn left. Follow Richards Street to Smylie Road and turn right. Follow Smylie Road to Robin Lane then turn right and continue on Robin Lane to the fork in the road. Take the right fork to the WWTP. Oct. 31, 2023 This project generally consists of internal relining and rehabilitation of approximately 1,740 L.F. of 18-inch and 21-inch RCP gravity wastewater pipeline. These pipelines are currently in service by the OWNER at the OWNER's wastewater treatment facility. They are used to direct sanitary sewer flow from a point of beginning at the facilities influent control structure to various points within the OWNER's treatment facilities by means of control structures until flow reaches the facility's effluent structure, prior to its discharge point. In addition, the project includes the internal relining of the diversion structures and inline manholes including the installation of one new manhole and the removal and replacement of the sluice gates with varying diameters and stem lengths in each of the diversion structures. The project will require bypass pumping and plugging equipment, CCTV inspection, and high-pressure cleaning in addition to the aforementioned items. All questions concerning this project during the Bidding process shall be forwarded to the project contact listed below. Alan Corey, P.E., Project Engineer CEPI, Inc. 6080 Enterprise Drive Casper, WY 82609 Phone: (307) 266-4346 (cell) Email: alan@cepi-casper.com

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents