Similar Projects
Nazareth Retreat Center - Phase 1
New Construction, Infrastructure - 13,112 SF
Conception
$3,375,000 CJ est. value
Fayetteville, AR 72701

Nazareth Retreat Center - Phase 3
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Fayetteville, AR 72701

Roof Repair, Siding and Painting Projects at Lake Catherine State Park
Renovation
Design
$187,108 CJ est. value
Hot Springs, AR 71913

Painting and Structural Repairs on the Main Wastewater Treatment Plant
Renovation
Design
$347,700 CJ est. value
Hot Springs, AR 71913

Repairs at Buckstaff Bathhouse
Infrastructure, Renovation
Bidding
$1,000,000 CJ est. value
Hot Springs National Park, AR 71901

New Water Well - Industrial Park Drive
Infrastructure
Bidding
$200,000 CJ est. value
Warren, AR 71671

Faulkner Lake Clarifier Launder Cover Project
Renovation
Post-Bid
North Little Rock, AR

Construction of Improvements to Wastewater Treatment Plant
Renovation
Post-Bid
Heber Springs, AR

Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades
Renovation
Results
Little Rock, AR 72206

Construction of the Proposed Wastewater Treatment Facility Improvements
Renovation
Results
$2,520,000 est. value
Flippin, AR

Maly Entertainment Center
New Construction - 56,758 SF
Construction
$1,000,000 to $5,000,000 est. value
Conway, AR 72034

Maly Entertainment Center
New Construction - 56,758 SF
Construction
$1,000,000 to $5,000,000 est. value
Conway, AR 72034

Massard Improvements Aeration Basin - City of Fort Smith
Renovation
Pending Verification
$20,000,000 CJ est. value
Fort Smith, AR 72904

Blue Ribbon Farms Expansion
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Springdale, AR 72762

Refurbish Wood Flooring Projects
Renovation
Design
Hot Springs, AR 71913

Last Updated 02/20/2023 10:09 AM
Project Title

Wastewater Treatment Plant Quiet Run Blowers at Lake Catherine State Park

Physical Address View project details and contacts
City, State (County) Hot Springs, AR 71913   (Garland County)
Category(s) Entertainment/Recreation, Sewer and Water
Sub-Category(s) Misc. Recreational, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $32,839 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Arkansas State Parks will be soliciting for vendors to be placed on a bidders list for Wastewater Treatment Plant Quiet Run Blowers at Lake Catherine State Park, 1200 Catherine Park Road, Hot Springs, AR 71913.If your company is interested in being placed on the bidders list send your company name and contact information to adphtbidderslist@arkansas.gov with the park name and project in the subject line. Please ensure your company name, email address, phone number, and a contact name are included in the email. There will be no questions answered during this process or planning rooms placed on the list. The deadline for submitting contact information is Wednesday, February 22, 2023. The method of Contractor Selection has not been Determined at this time

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents