Similar Projects
F--Radiological Decommissioning Services, Denver Federal Center CO USA
Term Contract
Post-Bid
Lakewood, CO 80215

Traffic Cones and Signage for the City and County of Denver
Infrastructure
Post-Bid
$250,000 CJ est. value
Denver, CO 80202

Replace Plumbing Abate Asbestos Centennial Building
Demolition, Alteration
Results
Denver, CO 80203

Replace Plumbing and Abate Asbestos
Alteration
Results
$200,000 est. value
Denver, CO 80203

DRUM Bishop Point Project
Term Contract
Post-Bid
Denver, CO 80202

BioWatch Air Sample Monitoring
Alteration
Results
Denver, CO

FY23 Petrohunter Phase Two Reclamation Project
Infrastructure
Post-Bid
Denver, CO 80202

Speed Limit Sign Replacement
Infrastructure
Results
$1,694,825 CJ est. value
Denver, CO 80202

Aqua Golf Turf Replacement
Infrastructure
Post-Bid
$500,000 CJ est. value
Denver, CO 80223

Traffic Control and Mobilization Services
Term Contract
Post-Bid
Denver, CO 80202

Waste, Recycling and Compost Services
Term Contract
Post-Bid
Denver, CO 80202

Circular Economy Development Center
Term Contract
Post-Bid
Denver, CO 80202

Backflow Testing and Repair
Term Contract
Post-Bid
Denver, CO 80202

Crane Rental Services
Term Contract
Post-Bid
Denver, CO 80202

Tivoli Quad Sod Replacement
Infrastructure
Post-Bid
$210,000 CJ est. value
Denver, CO 80204

Last Updated 06/28/2023 08:16 AM
Project Title

Welch Park Garden Bed Renovations

Physical Address View project details and contacts
City, State (County) Denver, CO 80231   (Denver County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 28 the project has not yet been awarded. A timeline for award has not yet been established . Arapahoe County (the County) is seeking responses from qualified landscape contractors to work in cooperation with the Open Spaces Department's Open Spaces, Parks, and Trails Maintenance Operations Division on landscape improvements at Welch Park located at 9015 E Jewel Circle, Denver, CO 80231. The park is an existing 3.6-acre neighborhood park in the Four-Square Mile area of unincorporated Arapahoe County. Opened to the public in 2006, the park provides a soft surface loop walking trail, picnic shelter, and playground for the community. The project will include the demolition of 14 planting beds, approximately 8,000 square feet in total size and the replanting of the beds. Ideally, the County would like to have this project completed Fall 2023 but is open evaluate alternative project completion dates if proposed by the contractor. Question Deadline 06/01/2023 at 4:00 PM MT Questions are submitted online Yes Reference Number 0000320708 Contact Information Katie Schwindt 303-738-7871 kschwindt@arapahoegov.com Demolition of the planting beds will include but not be limited to o Removal of all mulch o Removal of all fabric o Removal of all plant material o Removal of all irrigation back to the lateral line or valve o Removal of planter bed edging o Contour some planting beds to new configurations as shown on the approved landscape plan. o Level out planting beds existing soil and any new turf areas created by bed re-configuration. o Add topsoil back to existing grade for planting beds and new turf areas. o Till top 6inches of the soil, mixing the new topsoil with existing soil. o Conduct a soil sample from 5 of the 14 beds, randomly selected and send to the lab for analysis. o Based on soil lab analysis provide any necessary macro or micronutrients as soil amendments in order to obtain proper plant growth. Live culture mycorrhiza shall be added to each planting hole during plant installation. o Dig in or trench in new drip irrigation lines, as needed, make sure all irrigation improvements will work with the existing irrigation system prior to installation. Collaborate and coordinate all irrigation work with the Open Spaces Turf and Irrigation Specialist o Fine grade planting bed and any new turf areas to existing grade. o Install the new steel edging on planting bed perimeter. Restoration Re-Planting shall consist of but not be limited to o Follow the landscape architect's landscape plan in plant layout. Plant the 890 plants consisting of trees, shrubs, perennials, and grasses in each bed as indicated on the approved landscape plan. Install approximately 80 square feet bluegrass turf sod in new turf areas as indicated on the landscape plan. o Any deviation from the approved landscape planting plan will need the written approval of the Project Manager. o Properly transplant/install the new plant material according to the planting details specified on page P 2.0 of the Welch Park Bid Set Plans in (Exhibit A). o Install irrigation from lateral lines, which will include drip emitters to all new plant material. Any requested deviation from this will require the written approval of the Turf and Irrigation Specialist and by the Project Manager. o Install Pioneer Soil's Brown wood mulch 3 inches deep, spread out uniformly in the planting bed or as specified in the planting specifications. Clean up the site consisting of but not limited to o Removal all plant containers, wire baskets, burlap, strings, flagging, etc. o Remove all old edging, old plant bed plant material, any rocks, soil clumps or other debris uncovered during the project or made during the project and dispose of properly. o Fill in any ruts or depressions created by equipment with clean topsoil and re-seed with a seed mix approved by the Turf and Irrigation Specialist and the Project Manager. o Fill in any ruts created in the crusher fines trail with like colored and textured crusher fines as approved by the Project Manager. Drag the crusher fines trail to level out damaged sections of trail. o Remove any safety fencing or other components used on site by the vendor/contractor and any subcontractors. Clean up the parking lot area of any trash or debris.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents